Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Green Marine›ABS, DSME, GasLog team up for carbon-neutral shipping
Green Marine

June 10, 2022 · about 4 years ago

ABS, DSME, GasLog team up for carbon-neutral shipping

South Korean shipbuilder Daewoo Shipbuilding & Marine Engineering (DSME), classification society ABS and Greek LNG shipping services provider GasLog have joined forces to work towards carbon-neutral shipping. Specifically, the three companies signed a joint development project (JDP) focused on devel

2 minutes read
  • LinkedIn
  • X
  • Email
ABS, DSME, GasLog team up for carbon-neutral shipping
Courtesy of DSME

South Korean shipbuilder Daewoo Shipbuilding & Marine Engineering (DSME), classification society ABS and Greek LNG shipping services provider GasLog have joined forces to work towards carbon-neutral shipping.

Specifically, the three companies signed a joint development project (JDP) focused on developing onboard carbon capture and storage system (OCCS). The project was signed at the Posidonia International Shipping Exhibition.

This emission reduction technology returns CO2 from the exhaust gas back to the ship for storage by the process of absorption, regeneration and separation. The stored CO2, as a form of byproduct, can then be offloaded to the shoreside facilities after entering port.

Under the JDP, the parties will collaborate on the design of an optimal OCCS for an LNG carrier to be built by DSME and verify the system through risk analysis and tests before installation and operation.

The project will also seek to obtain ABS’ approval in principle (AIP) for the OCCS. The classification society will conduct a series of risk assessments and supervise the assessment procedure for the final AIP for the technology.

The partners intend to complete the joint development of the system by the first quarter of 2023.

The installation of the system is targeted to coincide with the construction of four LNG carriers ordered by GasLog from DSME last year. For its part, GasLog will undertake the technical requirements for the installation and operation of the OCCS as well as ship management expertise.

Related Articles

Clean Fuel

GasLog orders 4 LNG carriers from DSME

1 min read

The vessels are scheduled for delivery sequentially from the first half of 2024.

Commenting on the project, John McDonald , ABS’ executive vice president and COO, said: “Carbon capture onboard is going to be a critical technology in the industry’s push for net-zero. We are proud to be able to use our insight into OCCS to support … this landmark project, which promises to materially advance the adoption of this technology at sea.”

Register for Offshore Energy Exhibition & Conference:

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Green MarineBusiness Developments & ProjectsCollaborationOutlook & StrategyProject & TendersTransition

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Halliburton bags Eni’s deepwater bundle as Eastern Mediterranean gas buildout continues
  2. 2TechnipFMC picks up multimillion-dollar subsea scope for Petronas’ deepwater project
  3. 3Southeast Asia’s hydrocarbon push: Valeura hits oil pay, eyes new satellite development
  4. 4FSRU docks in Stade as LNG terminal prepares to feed gas into German grid from November

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free