Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business Developments & Projects›Bombora hires survey hand for mWave deployment site
Business Developments & Projects

August 15, 2022 · about 4 years ago

Bombora hires survey hand for mWave deployment site

Bombora Wave Power has awarded a contract for pre-installation surveys at East Pickard Bay for its mWave wave energy device demonstration.

2 minutes read
  • LinkedIn
  • X
  • Email
mWave wave energy device under construction (Courtesy of Bombora Wave Power)

Bombora Wave Power has awarded a contract for pre-installation surveys at East Pickard Bay for its mWave wave energy device demonstration.

Bombora Wave Power hired a Dorchester-based company Shoreline Surveys for the scope of work which consists of planning and mobilizing a survey vessel and completing pre-installation hydrographic and geophysical surveys at the mWave’s East Pickard Bay deployment site.

The primary objective of the surveys is to locate an area within the site that meets the design requirements and is clear of debris and unexploded explosive ordnance (UXO).

The contractor is also required to compete a survey of the cable route, according to Bombora Wave Power.

Bombora Wave Power is currently finalizing testing and assembly phase for its mWave device, said to be the world’s most powerful wave energy converter, rated at 1.5MW.

The final assembly process will be completed on the quayside in Pembroke Dock in the coming months before loadout to the operational site at East Pickard Bay, where the technology will be validated in the open ocean, advancing it to Technology Readiness Level (TRL) 7/8 – meaning the device prototype has been demonstrated and qualified in an operational environment.

East Pickard Bay is one of the three marine energy test sites in and around the Milford Haven Waterway, forming a part of the Marine Energy Test Area (META) , Wales’ national test center, which secured the lease for the sites from The Crown Estate back in August 2021.

Offering moderate to high energy areas for operational ‘real-sea’ testing, the East Pickard Bay site is suitable for the demonstration of wave and floating offshore wind components .

The mWave wave energy device is comprised of a series of air-inflated concave cells covered with rubber membranes and mounted into a steel foundation structure.

The device weighs 900 tonnes, and is 75 meters long, 15 meters wide and 6 meters high. According to Bombora Wave Power, the mWave cell modules can be configured to suit fixed-bed nearshore foundation systems, or floating offshore ocean energy systems.

Follow Offshore Energy – Marine Energy

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business Developments & ProjectsCollaborationEquipmentOperations & MaintenanceOutlook & StrategyTechnology

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

12 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

12 days ago