Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo
Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Fossil Energy›Brazilian field back online after downtime ends
Fossil Energy

August 18, 2022 · about 4 years ago

Brazilian field back online after downtime ends

Enauta has restarted production from a field off Brazil following a shutdown in preparation for the recertification of the field’s FPSO.

2 minutes read
  • LinkedIn
  • X
  • Email
Brazilian field back online after downtime ends
FPSO Petrojarl I; Source: Enauta

Brazilian oil and gas player Enauta has restarted production from a field offshore Brazil following a scheduled shutdown in preparation for the recertification of the floating, production, storage, and offloading (FPSO) vessel, which is currently working on the field.

Enauta started the Atlanta field ’s scheduled downtime at the start of July. As disclosed at the time, the downtime aimed to comply with the Ministry of Labor’s normative requirements and prepare the FPSO to be recertified by DNV (Det Norske Veritas), in regards to a two-year extension of chartering, operation & maintenance (O&M) agreements for the FPSO Petrojarl I .

Earlier this month, the Brazilian firm revealed its plans to restart production at the field in the following days with expectations for it to return to normal production by September.

Related Articles

Fossil Energy

Brazilian field’s downtime coming to an end

2 min read

In an update on Wednesday, Enauta informed that production, which had resumed at the Atlanta field, was in the process of normalisation. Located in block BS-4 in the Santos Basin , the Atlanta field has estimated reserves of 106 MMbbl.

The field is operated by Enauta Energia, a wholly-owned subsidiary of the company, which has a 100 per cent interest in this asset. The Atlanta field has been producing since 2018 through an Early Production System (EPS), which entails three wells connected to the FPSO Petrojarl I.

After recertification, the FPSO’s contractual extension will enable it to continue operating on the field until the entry of the Full Development System (FDS), which is expected by mid-2024, originally with six wells , reaching ten wells in 2029 .

To this end, Enauta inked a purchase deal with Malaysia’s Yinson – based on the Letter of Intent (LoI) from December 2021 – for the FPSO OSX-2 , which was closed in February . Currently, the vessel is being converted at Dubai Drydocks World .

Once the conversion is completed, the vessel – named FPSO Atlanta – will be operated under ABS Class and it will be deployed at the Atlanta field.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Fossil EnergyFPSO & VesselsOil & GasBusiness & FinanceBusiness Developments & ProjectsExploration & ProductionOperations & Maintenance

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1SED Energy Holdings and Ventura Offshore to unite into one
  2. 2New Boskalis rock installation vessel starts work offshore Poland
  3. 321 companies apply for Norway’s new oil & gas exploration areas
  4. 4Spanish shipyard launches its largest-ever vessel, built for Østensjø Rederi

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free