Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Fugro to work on first Mediterranean floating offshore wind project
Business & Finance

September 1, 2022 · about 4 years ago

Fugro to work on first Mediterranean floating offshore wind project

Fugro has won a contract with Renexia to carry out surveys at the 2.8 GW Med Wind project, the first floating offshore wind project in the Mediterranean. Fugro will perform marine geophysical and environmental surveys to acquire comprehensive geo-data at the proposed wind farm location in water dept

2 minutes read
  • LinkedIn
  • X
  • Email
Fugro gets contract for first Mediterranean floating offshore wind project

Fugro has won a contract with Renexia to carry out surveys at the 2.8 GW Med Wind project, the first floating offshore wind project in the Mediterranean.

Fugro will perform marine geophysical and environmental surveys to acquire comprehensive geo-data at the proposed wind farm location in water depths of 300 to 900 meters and along the two proposed export cable corridors.

Once the necessary geo-data is acquired, the results of the analysis will be used to advise on geohazard risk mitigation and identify a safe route for the installation of the two export cables.

These results will also feed into the final integrated environmental impact assessment (EIA) application to Italy’s Ministry of Energy Transition.

“We are really proud to support Renexia in this challenging floating offshore wind project, which will help our country’s transition to decarbonisation and a sustainable future of green energy and power diversification,” said Rodolfo D’Addario , country manager for Fugro in Italy.

The Med Wind project will feature 190 turbines covering an area of 850 km 2 , located 60 kilometers off the Italian coast

Construction of the 2.8 GW floating offshore wind project is expected to start by 2025, with commissioning planned on 1 January 2026.

To remind, the first offshore wind farm built in Italy, as well as the first such project in the Mediterranean, was completed, commissioned and inaugurated earlier this year.

The 30 MW Beleolico offshore wind farm, which features ten MySE3.0-135 turbines delivered by MingYang Smart Energy, was also developed by Renexia.

Register for Offshore Energy Exhibition & Conference:

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceBusiness Developments & ProjectsProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free