Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Petrofac to define offtake route for Southern North Sea gas project
Business & Finance

October 11, 2022 · about 3 years ago

Petrofac to define offtake route for Southern North Sea gas project

Petrofac has been selected by Hartshead Resources to conduct an engineering study to define an offtake route from its Southern North Sea fields.

2 minutes read
  • LinkedIn
  • X
  • Email
Leman Alpha complex in the North Sea

Oilfield services provider Petrofac has been selected by Hartshead Resources to conduct an engineering study to define the Phase I offtake route from its Somerville and Anning gas fields in the Southern North Sea.

Petrofac explained in a statement on Tuesday that the study aims to define an efficient and fast route to increase the UK’s energy security by making the most of Shell’s existing infrastructure in the Southern North Sea.

It will provide a basis for the design and cost estimate, and the brownfield modifications needed, to tie-in Hartshead’s proposed new facilities to Shell’s Corvette and Leman A platforms . From there, the gas will be transported to Bacton for onshore processing and delivery to the UK’s transmission system, Petrofac said.

Hartshed agreed with Shell to undertake the engineering study for the tie-in of Hartshead’s Phase I gas field development to Shell’s infrastructure back in August 2022.

Hartshead is the operator of License P2607 , which contains multiple gas fields including the Somerville and Anning. These two are part of the Phase I development.

Hartshead’s field development planning work for these two fields is underway. Following the submission of the Phase I development Concept Select Report (CSR) to the North Sea Transition Authority (NSTA) in May 2022, the company has received a “Letter of No Objection”, which finalised the “Assessment Phase” of the field development and allowed entry into the “Authorisation Phase”.

Hartshead intends to complete the Front-End Engineering & Design (FEED) stage and define the gas export route during 2022/2023 with a view to taking a Final Investment Decision (FID) on the development, including new platforms, in 2023 and achieving the first gas in late 2024 .

The scope of the study by Petrofac includes offshore construction support for the subsea pipeline tie-in activities on the Corvette to Leman Alpha export pipeline, communication connections, pipework for system control and export route options and control room integration.

Nick Shorten , Chief Operating Officer for Petrofac’s Asset Solutions business said: “It’s great to see Petrofac’s considerable engineering expertise helping to maximise economic recovery. Using Shell’s existing infrastructure to tap into Hartshead’s gas fields will efficiently help support the UK’s energy security at this critical time.”

This is Petrofac’s second contract award this week following a two-year deal for the well management of Dana Petroleum’s North Sea assets announced on Monday.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceBusiness Developments & ProjectsExploration & ProductionProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

23 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

24 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

23 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

24 days ago