Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo

© 2026 Navingo. All rights reserved.

Home›Business Developments & Projects›U.S. companies join forces to design and construct all-electric truckable tug
Business Developments & Projects

December 1, 2022 · about 3 years ago

U.S. companies join forces to design and construct all-electric truckable tug

U.S.-based design and engineering company Elliott Bay Design Group (EBDG) and marine metal fabrication shop Miller Marine have joined forces to design and build a fully electric truckable tug.

1 minutes read
  • LinkedIn
  • X
  • Email
U.S. companies join forces to design and construct all-electric truckable tug

U.S.-based design and engineering company Elliott Bay Design Group (EBDG) and marine metal fabrication shop Miller Marine have joined forces to design and build a fully electric truckable tug.

As explained, EBDG will incorporate an electrical propulsion system into Miller Marine’s proven truckable tug design. Once the design phase is complete, Miller Marine will build the vessel at its 1393.5 square meter production facility.

The vessel has an overall length of just under 26 feet (approx. 8 meters) and will be powered by two permanent magnet motors with a total power of 300+ kW.

Shore power will be used to recharge the ship’s battery banks overnight, taking no more than eight hours. On a full charge, the vessel will operate with contingency for 12+ hours, according to the company.

A closed-loop fluid cooling system will provide temperature control of the batteries, motors and electronics, maximizing their lifetime. This configuration is ideally suited for shallow and silty water operations, EBDG noted.

The electric tug is intended to support public agency and private enterprise marine construction operations and short-range logistics. This includes servicing marine construction sites, tending dredges, tending buoys, short-range ferry operations and other near-shore operations such as crew transportation or line handling

In the past, EBDG designed a hybrid-electric passenger vehicle ferry for Maine ferry operator Casco Bay Lines. The vessel entered the construction phase this July.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business Developments & ProjectsVessels

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free