Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo

© 2026 Navingo. All rights reserved.

Home›Project & Tenders›European developer seeks installation vessels for offshore wind projects
Project & Tenders

December 23, 2022 · about 3 years ago

European developer seeks installation vessels for offshore wind projects

Energy company Vattenfall has issued contract notices seeking vessels to transport and install wind turbine foundations and wind turbines at two offshore wind farms. The calls to tender were issued by Vattenfall Atlantis 1 und Global Tech 2 Offshore Wind GmbH for the N-7.2 and N-6.6 projects in the

2 minutes read
  • LinkedIn
  • X
  • Email
An aerial photo of the Horns Rev 1 offshore wind farm in Denmark

Energy company Vattenfall has issued contract notices seeking vessels to transport and install wind turbine foundations and wind turbines at two offshore wind farms.

The calls to tender were issued by Vattenfall Atlantis 1 und Global Tech 2 Offshore Wind GmbH for the N-7.2 and N-6.6 projects in the German North Sea.

The first contract notice covers the provision of a wind turbine installation vessel or vessels and is divided into two lots, Lot 1 covering the N-7.2 project, and Lot 2 covering the N-6.6 project.

Tenders may be submitted for all lots and interested parties have until 27 January 2023 to submit their bids.

Similarly, the tender for foundation installation work is divided into two lots, Lot 1 covering the N-7.2, and Lot 2 covering N-6.6. Again, tenders may be submitted for both lots and the bids are due by 27 January.

As reported earlier this year, Vattenfall exercised its step-in-rights to develop an offshore wind farm in the N-7.2 zone in the German North Sea after RWE had won the tender with a zero-subsidy bid.

Following a final investment decision by Vattenfall, the offshore wind farm could be connected to the German electricity grid sometime in 2027 and when fully developed, would have an output of 980 MW.

Related Article

Vattenfall issues inter-array cable contract notice for German offshore wind farms

Located 85 kilometres off the island of Borkum, the N-7.2 project was originally developed under the name Global Tech II by a consortium led by Strabag SE.

Vattenfall acquired the project in 2016, but when a new offshore wind tendering system was put in place, the area was auctioned again.

Vattenfall held the step-in rights for the zone through Vattenfall Atlantis 1 and Global Tech 2 Offshore Wind GmbH.

The step-in rights were awarded to companies whose projects had not made it through the second transitional tenders in previous auctions.

Located some 100 kilometres northwest of the island Borkum, the N-6.6 area is expected to support a capacity of up to 630 MW. The zone is scheduled to be put out to tender in September 2024, and put into operation in 2029.

Vattenfall plans to develop the Atlantis 1 offshore wind project within the N-6.6 zone. The company acquired the 584 MW project from PNE Wind AG in early 2017.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Project & TendersVessels

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free