Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Gasgrid reduces number of planned LNG import slots at Inkoo terminal
Business & Finance

March 9, 2023 · about 3 years ago

Gasgrid reduces number of planned LNG import slots at Inkoo terminal

Finnish transmission system operator Gasgrid Finland has reduced the total number of planned LNG import slots at the country’s first FSRU-based terminal for Q2 and Q3 2023. Finland’s floating LNG terminal is located in the port of Inkoo where Excelerate Energy’s floating storage and regasification u

2 minutes read
  • LinkedIn
  • X
  • Email
Gasgrid reduces number of planned LNG import slots at Inkoo terminal

Finnish transmission system operator Gasgrid Finland has reduced the total number of planned LNG import slots at the country’s first FSRU-based terminal for Q2 and Q3 2023.

Finland’s floating LNG terminal is located in the port of Inkoo where Excelerate Energy’s floating storage and regasification unit (FSRU) Exemplar was anchored at the end of 2022 to begin the commissioning period which ended on 25 January.

The vessel has a storage capacity of 150,900 m3 of LNG and can provide more than 5 billion cubic metres per year (bcm/y) of regasification capacity.

The unit will serve Finland, Estonia and the Baltic Sea region under the ten-year charter agreement signed by Excelerate Energy and Gasgrid Finland in May 2022.

The capacity allocation process for the period between 1 April to September 30 2023 commenced on 15 December 2022 with Gasrid offering 14 terminal slots of 1,000 GWh.

During this time, Estonian energy company Eesti Gaas reached an agreement to bring seven LNG cargoes to the port of Inkoo in Finland in the spring and summer this year.

Gasgrid has now released a statement saying that the total number of planned slots for Q2 and Q3 was reduced to 10 due to the limitation of transmission capacity in the Baltic Connector and expected market demand.

The company added that out of these 10 slots, three slots are free for reservations. Simultaneously, Gasgrid’s unit and the operator of the Inkoo terminal, Floating LNG terminal Finland Oy, has invited interested parties to submit their bids for the remaining slots.

Three slots of 950 GWh are available for April, August and September

Related Article

Gasgrid Finland’s LNG floating terminal is fully up and running

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceBusiness Developments & Projects

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free