Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Power cables now in place for electrification of Utsira High
Business & Finance

March 28, 2023 · about 3 years ago

Power cables now in place for electrification of Utsira High

NKT has completed the power cable systems connecting six offshore oil and gas platforms located at Utsira High to the onshore power supply. This is said to play a central role in reducing carbon emissions from the Norwegian continental shelf (NCS) with 1.2 million tonnes annually. NKT has provided t

2 minutes read
  • LinkedIn
  • X
  • Email
Power cables now in place for electrification of Utsira High

NKT has completed the power cable systems connecting six offshore oil and gas platforms located at Utsira High to the onshore power supply. This is said to play a central role in reducing carbon emissions from the Norwegian continental shelf (NCS) with 1.2 million tonnes annually.

NKT has provided turnkey DC cable systems for Johan Sverdrup 1 and 2 and from there continuing the cable connections with AC cables to the platforms Edvard Grieg, Gina Krog, Gudrun, Ivar Aasen and Sleipner.

All cables were produced at the company’s factory in Karlskrona, Sweden, while most of the installation was carried out by cable laying vessel NKT Victoria.

“It has been a pleasure to continue our long-term collaboration with Equinor and Aker BP by supporting the electrification of Utsira High,” said Claes Westerlind , Executive Vice President and Head of the high-voltage engineering and manufacturing center in Karlskrona, Sweden.

“We have had great teamwork with both customers and subcontractors which has been essential for us to bring the projects safely to the finish line without incidents or acci­dents. Collaboration has also been important to be delivering the cable projects on time and within budget, even during the challenging years with the pandemic.”

The electrification of the operations in Utsira High is said to have been a strategic focus for Equinor and Aker BP for several years paving the way for a significant reduction of the carbon emissions from the NCS.

According to NKT, the annual reduction of 1.2 million tonnes of CO2 is equivalent to 2.5 per cent of Norway’s total emissions in 2022 and supports reaching climate ambitions including the goal for net zero emissions by 2050.

Speaking about recent activities at Utsira High, at the end of 2022 Equinor started production from the Johan Sverdrup Phase 2 project, ensuring that the entire field is now online.

As it will produce 720,000 barrels of oil daily at a plateau, aiming to rise to 755,000 barrels per day, Equinor highlights that this field alone can meet 6-7 per cent of the daily oil demand in Europe with recoverable volumes totaling 2.7 billion barrels of oil equivalent.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceBusiness Developments & ProjectsEnvironmentOutlook & StrategyProject & TendersTransitionVision

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

11 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

11 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

11 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

11 days ago