Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Authorities & Government›European Commission taps Hellenic Cables for floating wind pilot project
Authorities & Government

April 4, 2023 · about 3 years ago

European Commission taps Hellenic Cables for floating wind pilot project

Greek cable manufacturer Hellenic Cables has been selected by the European Commission to take part in delivering the Infinite project aimed at accelerating industrial-scale floating wind. The Infinite project includes the deployment and testing of a 4.8 MW floating wind pilot system at a 100-meter w

1 minutes read
  • LinkedIn
  • X
  • Email
European Commission taps Hellenic Cables for floating wind pilot project

Greek cable manufacturer Hellenic Cables has been selected by the European Commission to take part in delivering the Infinite project aimed at accelerating industrial-scale floating wind.

The Infinite project includes the deployment and testing of a 4.8 MW floating wind pilot system at a 100-meter water depth and the creation of a disruptive and environment-friendly concrete tension leg platform anchored with an innovative tendon-based mooring system.

For the project, Hellenic Cables is in charge of the certification and supply of a 66 kV dynamic cable design, said to be safer, lighter, cost-effective, and allow more standardization in operations and maintenance.

According to the Greek company, the activities include using AI instead of Cu conductor, integrating fiber optic elements for strain monitoring, as well as optimizing the cable toward global loading regime and mechanical stress.

Speaking about the company’s most recent news, Hellenic Cables last month signed a contract with the Greek electricity grid operator Independent Power Transmission Operator (IPTO) for the fourth phase of the Cyclades interconnection project.

The project includes the Lavrio-Serifos and Serifos-Milos interconnections with a total length of 170 kilometers.

SUBSCRIBE

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Authorities & GovernmentBusiness & FinanceBusiness Developments & ProjectsOperations & MaintenanceProject & TendersRegulation & PolicyResearch & Development

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

12 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

12 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

12 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

12 days ago