Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Cabling›Final inter-array cables loaded and ready for world’s largest floating wind farm
Cabling

May 19, 2023 · about 3 years ago

Final inter-array cables loaded and ready for world’s largest floating wind farm

The final inter-array cable loadout has been completed for Equinor’s Hywind Tampen, the world’s largest floating offshore wind farm in operation. The remaining eleven kilometres of 630mm2 dynamic cabling including accessories were loaded onto the Normand Vision, a construction support vessel (CSV) f

1 minutes read
  • LinkedIn
  • X
  • Email
Hywind Tampen JDR Cable Systems
JDR Cable Systems

The final inter-array cable loadout has been completed for Equinor’s Hywind Tampen, the world’s largest floating offshore wind farm in operation.

The remaining eleven kilometres of 630mm2 dynamic cabling including accessories were loaded onto the Normand Vision , a construction support vessel (CSV) from Ocean Installer, the company in charge of installing inter-array cables on the Hywind Tampen floating offshore wind farm.

Related Articles

Cabling

Ocean Installer lands Hywind Tampen cable installation gig

2 min read

JDR Cable Systems will support the termination and testing work once the cables have been installed for the world’s largest floating offshore wind farm to date.

The UK-headquartered company is responsible for supplying the electric cables for the project from its factory in Hartlepool, with the first of multiple load-outs being completed in July last year.

Related Articles

Cabling

Subsea 7 plants first cables for Hywind Tampen floating offshore wind farm

2 min read

Hywind Tampen is the first wind farm in the world that is supplying electricity to oil and gas platforms.

The project has a system capacity of 88 MW and is expected to meet 35 per cent of the electrical power demand on the Gullfaks and Snorre fields. This will cut CO2 emissions from the fields by about 200,000 tonnes per year, according to Equinor.

The power from the first wind turbine was delivered to the Gullfaks A platform in the North Sea on 13 November 2022, while the project started delivering power to the second oil and gas field, Snorre, just a few days ago.

Related Articles

Fossil Energy

Hywind Tampen floating wind farm now delivering to second oil and gas field

1 min read

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

CablingOffshore WindSubseaWind FarmsBusiness Developments & ProjectsOperations & Maintenance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Saipem hands Saudi jack-up fleet to ADES in strategic shallow-water exit
  2. 2Valeura advances Gulf of Thailand expansion with PTTEP farm-in approval
  3. 3Santos broadens Asia-Pacific LNG portfolio with Canadian supply and 10-year POSCO deal
  4. 4Borr Drilling keeps three jack-up rigs as it reorganizes Mexico ops with stake sale

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free