Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business Developments & Projects›Final inter-array cables loaded and ready for world’s largest floating wind farm
Business Developments & Projects

May 19, 2023 · about 3 years ago

Final inter-array cables loaded and ready for world’s largest floating wind farm

The final inter-array cable loadout has been completed for Equinor’s Hywind Tampen, the world’s largest floating offshore wind farm in operation. The remaining eleven kilometres of 630mm2 dynamic cabling including accessories were loaded onto the Normand Vision, a construction support vessel (CSV) f

2 minutes read
  • LinkedIn
  • X
  • Email
Hywind Tampen JDR Cable Systems

The final inter-array cable loadout has been completed for Equinor’s Hywind Tampen, the world’s largest floating offshore wind farm in operation.

The remaining eleven kilometres of 630mm2 dynamic cabling including accessories were loaded onto the Normand Vision , a construction support vessel (CSV) from Ocean Installer, the company in charge of installing inter-array cables on the Hywind Tampen floating offshore wind farm.

JDR Cable Systems will support the termination and testing work once the cables have been installed for the world’s largest floating offshore wind farm to date.

The UK-headquartered company is responsible for supplying the electric cables for the project from its factory in Hartlepool, with the first of multiple load-outs being completed in July last year.

Related Article

Subsea 7 plants first cables for Hywind Tampen floating offshore wind farm

Hywind Tampen is the first wind farm in the world that is supplying electricity to oil and gas platforms.

The project has a system capacity of 88 MW and is expected to meet 35 per cent of the electrical power demand on the Gullfaks and Snorre fields. This will cut CO2 emissions from the fields by about 200,000 tonnes per year, according to Equinor.

The power from the first wind turbine was delivered to the Gullfaks A platform in the North Sea on 13 November 2022, while the project started delivering power to the second oil and gas field, Snorre, just a few days ago.

Related Article

Hywind Tampen floating wind farm now delivering to second oil and gas field

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business Developments & ProjectsOperations & Maintenance

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

12 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

12 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

12 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

12 days ago