Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo

© 2026 Navingo. All rights reserved.

Home›Business & Finance›TotalEnergies entrusts more work to TechnipFMC off Angola
Business & Finance

August 24, 2023 · about 3 years ago

TotalEnergies entrusts more work to TechnipFMC off Angola

TechnipFMC has gotten its hands on another job in Angola, thanks to a multi-million dollar contract for the installation of flexible pipe and associated subsea structures at a life extension project, which is operated by TotalEnergies.

2 minutes read
  • LinkedIn
  • X
  • Email
Girassol field; Source: TotalEnergies

UK-headquartered TechnipFMC has gotten its hands on another job in Angola, thanks to a multi-million dollar contract for the installation of flexible pipe and associated subsea structures at a life extension project, which is operated by TotalEnergies EP Angola, a subsidiary of France’s energy giant TotalEnergies.

TechnipFMC perceives this deal for the Girassol life extension project (GIR LIFEX) to be a significant one, as it is expected to bring between $75 million and $250 million. TotalEnergies EP Angola and its Block 17 partners, which have now hired TechnipFMC to install flexible pipe and associated subsea structures for this project, previously picked the firm for the engineering, procurement, and supply of subsea flowlines and connectors for the GIR LIFEX project.

Jonathan Landes , President, Subsea at TechnipFMC, commented: “The seamless integration of engineering, manufacturing, and installation provides our clients with the flexibility and agility they need to meet their project goals. We have good knowledge of this field, having built the subsea tree systems for the original Girassol development. It gives us immense pride that our long-term clients continue to show trust and confidence in our solutions through subsequent awards.”

Located 210 kilometres off the coast of Luanda in Block 17, the Girassol field was discovered in 1996. Covering an area of 14 by 10 kilometres, Girassol was the first of the Block 17 fields to come on stream in December 2001. In addition, it was the first deepwater project conducted in Angola. The field was developed using a subsea facility tied back to a floating production, storage, and offloading unit (FPSO).

This deal comes only weeks after TechnipFMC secured a deal with Azule Energy, a joint venture between BP and Eni, together with Aker Solutions for the Ndungu project offshore Angola.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceBusiness Developments & ProjectsProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free