Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business Developments & Projects›Gulf LNG Tugs places order for four low-emission tugboats
Business Developments & Projects

September 6, 2023 · about 2 years ago

Gulf LNG Tugs places order for four low-emission tugboats

Gulf LNG Tugs of Brownsville (Gulf LNG Tugs) has signed two construction contracts with Master Boat Builders and Sterling Shipyard for each shipyard to construct two tugs to serve the Rio Grande LNG export facility (RGLNG).

2 minutes read
  • LinkedIn
  • X
  • Email
Gulf LNG Tugs places order for four low-emission tugboats

Gulf LNG Tugs of Brownsville (Gulf LNG Tugs) has signed two construction contracts with Master Boat Builders and Sterling Shipyard for each shipyard to construct two tugs to serve the Rio Grande LNG export facility (RGLNG).

Each shipyard will construct two Z-Tech ® 30-80 tugboats designed by naval architect Robert Allan Ltd. These 30-80s represent a proven workhorse in Gulf Coast ports, where affiliates of Gulf LNG Tugs already operate 10 of the same hull design.

The tugboats will meet U.S. Coast Guard Sub-M regulations and will be classed through the American Bureau of Shipping (ABS). The main propulsion engines are Caterpillar 3516 E, complying with EPA Tier-4 emission standards, and the tugs will receive ABS low-emission vessel notation.

The main engines are connected to Schottel SRP 510 FP-Z drives fitted with 2.8-meter propellers. The tugs are fitted with a Markey DEPSF-48-100 HP Electric Class III hawser winch, providing full bollard pull performance Render-Recover feature.

The new tugboats will have an overall length of 98.5 feet (30 meters), beam of 42.7 feet (13 meters), and a bollard pull of 80 metric tonnes. Additionally, each tug will be equipped with firefighting capabilities to meet the ABS Fire Fighting Class 1 (FiFi 1) classification.

“We are immensely proud to continue our partnership with Gulf LNG Tugs’ owners, and we look forward to delivering the Z-Tech ® 30-80’s to provide years of reliable escort service for RGLNG,” said Garrett Rice , President of Master Boat.

“Sterling Shipyard is excited to commence construction of the Z-Tech ® 30-80’s. Gulf LNG Tugs and its owners are premier tug service providers, and we’re honored to support their growth,” said Harry Murdock , CEO of Sterling.

To remind, U.S.-based energy company NextDecade has made a positive final investment decision (FID) to construct the first three liquefaction trains at Rio Grande LNG (RGLNG) export facility in Brownsville, Texas.

In conjunction with making a positive FID, RGLNG issued the notice to proceed (NTP) to Bechtel Energy to begin construction of Phase 1 under its engineering, procurement and construction contracts (EPC).

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business Developments & ProjectsProject & TendersVessels

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

23 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

23 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

23 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

23 days ago