Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business Developments & Projects›Ørsted picks CRP Subsea’s cable protection system for Greater Changhua 2b & 4
Business Developments & Projects

September 19, 2023 · about 2 years ago

Ørsted picks CRP Subsea’s cable protection system for Greater Changhua 2b & 4

CRP Subsea has been awarded a contract by Ørsted to provide NjordGuard, an integrated cable protection system, for the Greater Changhua 2b and 4 offshore wind farms in Taiwan. Under the contract, CRP Subsea will supply a total of 142 NjordGuard cable protection systems, which will protect all inter-

1 minutes read
  • LinkedIn
  • X
  • Email
A crew transfer vessel at an offshore wind farm, aerial view

CRP Subsea has been awarded a contract by Ørsted to provide NjordGuard, an integrated cable protection system, for the Greater Changhua 2b and 4 offshore wind farms in Taiwan.

Under the contract, CRP Subsea will supply a total of 142 NjordGuard cable protection systems, which will protect all inter-array and export cables at the offshore wind projects.

Production of the 142 NjordGuards will take place in the northwest of England at CRP Subsea’s purpose-built manufacturing facility.

Project engineering works will commence immediately, said the company, with installation activities scheduled for execution in 2024.

The Greater Changhua 2b and 4 offshore wind farms will comprise around 65 wind turbines with an individual capacity of 14 MW, installed some 35-60 kilometers off the Changhua coast.

LS Cable & System is responsible for the supply of high-voltage subsea , while the Netherlands-based Twentsche KabelFabriek (TKF) will deliver close to 200 kilometers of inter-array cables for both projects.

In 2018, Ørsted secured 920 MW of grid capacity for the offshore wind farms in Taiwan’s first competitive price-based auction with no mandatory local content requirements.

Two years later, the developer signed a corporate power purchase agreement (CPPA) with Taiwan Semiconductor Manufacturing Company (TSMC) for the offtake of the full production from Changhua 2b and 4.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business Developments & ProjectsOperations & Maintenance

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

11 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

11 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

11 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

11 days ago