Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Fossil Energy›New 15-year deals enable Altera to redeploy FPSO and shuttle tanker at Eni’s African oil & gas project
Fossil Energy

October 3, 2023 · about 3 years ago

New 15-year deals enable Altera to redeploy FPSO and shuttle tanker at Eni’s African oil & gas project

Altera Infrastructure has secured contracts for the redeployment of an FPSO vessel and a shuttle tanker, which will be converted into an FSO.

3 minutes read
  • LinkedIn
  • X
  • Email
FPSO Voyageur Spirit; Source: Altera Infrastructure
FPSO Voyageur Spirit; Source: Altera Infrastructure

UK-based energy services provider Altera Infrastructure has secured contracts for the redeployment of a cylindrical floating production storage and offloading (FPSO) vessel and a shuttle tanker, which will be converted into an FSO. Both of these vessels will work at Eni’s oil and gas development offshore Côte d’Ivoire, Africa.

According to Altera Infrastructure, the awarded contracts are for the redeployment of the FPSO Voyageur Spirit and the Nordic Brasilia shuttle tanker to be converted into an FSO. With a 15-year firm contract, both vessels will work at Eni’s Baleine Phase 2 project located offshore Côte d’Ivoire, which is expected to be fast-tracked with a planned start-up date in the fourth quarter of 2024.

Currently, the FPSO Voyageur Spirit and the 2004-built Nordic Brasilia vessel are undergoing life extension work and field-specific modifications at Drydocks World in Dubai. The 2008-built FPSO with a dead weight of 45,145 t previously operated on the Huntington field in the North Sea until 2020. This vessel, which has a length of 70 m and a breadth of 65 m, was at Kishorn Port and dry dock from July 2020 until April 2023.

Related Articles

Fossil Energy

FPSO leaves UK port after nearly three years – gallery

2 min read

Altera explains that the Nordic Brasilia shuttle tanker will be converted into an FSO to provide additional storage capacity to the FPSO. The company will own and operate both vessels. The UK firm highlights that the development of the Baleine project is Africa’s first net-zero Scope 1 and 2 emissions project.

Chris Brett , President of Altera Infrastructure Production, commented: “Securing contracts in a promising region like Côte d’Ivoire is a significant acknowledgment of Altera’s capability in delivering complex projects on a fast-track timeline. This is now our second contract award in short succession based on the redeployment of an existing FPSO and demonstrates that redeployments are some of the fastest, most cost-effective and emissions-friendly ways for our customers to develop their projects in the current market.”

The Baleine East 1X well was drilled using the Saipem 12000 drillship. The well reached its final depth of 3,165 m measured depth, in a water depth of about 1,150 m. Eni started production from the Baleine field at the end of August 2023, less than two years after the discovery in September 2021 and less than a year and a half after the final investment decision (FID) was made.

Related Articles

Fossil Energy

Eni brings African oil & gas field on stream less than two years after discovery

3 min read

The Baleine field extends over blocks CI-101 and CI-802. In April 2023, the FPSO Firenze – renamed Baleine upon its mooring – sailed away from Dubai to the Baleine field in Côte d’Ivoire. This FPSO has been refurbished and upgraded to increase its processing capacity up to 15,000 bbl/d of oil and around 25 mmcf/d of associated gas.

The start of Phase 2, which is expected by the end of 2024, will increase field production to 50,000 bbl/d of oil and approximately 70 mscf/d of associated gas. The third development phase aims to elevate field production to 150,000 bbl/d of oil and 200 mscf/d of gas.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Fossil EnergyFPSO & VesselsLow-Carbon TransitionOil & GasRigsBusiness & FinanceBusiness Developments & ProjectsExploration & ProductionProject & Tenders

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Petrobras locks in 20-year US supply from Sempra’s LNG project in Lone Star State
  2. 2Hanwha Ocean’s design solution allowing LNG carrier’s switch to ammonia gets ABS’ thumbs-up
  3. 3Exmar’s FLNG conversion earns Bureau Veritas’ seal of approval
  4. 4Denmark opens EU’s first full-scale CO2 storage site

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free