Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Fossil Energy›Subsea tie-back win for Ocean Installer with Equinor
Fossil Energy

October 18, 2023 · about 2 years ago

Subsea tie-back win for Ocean Installer with Equinor

Norway’s energy giant Equinor has awarded Ocean Installer with an engineering, procurement, construction and installation (EPCI) contract for the subsea tie-back of the Eirin gas field in Norwegian waters. The scope covers the installation of structures, flexibles, umbilical, seabed rectification, t

2 minutes read
  • LinkedIn
  • X
  • Email
EPCI contract win for Ocean Installer with Equinor
Source: Ocean Installer

Norway’s energy giant Equinor has awarded Ocean Installer with an engineering, procurement, construction and installation (EPCI) contract for the subsea tie-back of the Eirin gas field in Norwegian waters.

The scope covers the installation of structures, flexibles, umbilical, seabed rectification, tie-ins, and commissioning, as well as the design, fabrication, and installation of GRP covers and spool.

The award also constitutes an option for a new gas export solution from Troll B via the existing Kvitebjørn export pipeline.

Engineering will commence immediately and both projects are planned to be completed by 2025.

“It is great to see that Equinor and its partners continue to develop and invest in the Norwegian Continental Shelf and that they once again put their trust in Ocean Installer to help them realize fast track projects like Eirin and potentially Troll B Gas Export,” said Ocean Installer’s CEO Kevin Murphy .

Equinor announced in September that it had submitted a plan for the development and operation (PDO) for the Eirin gas discovery.

Related Articles

Fossil Energy

Equinor hands over development plan for multi-million gas tie-back in North Sea

3 min read

Eirin, originally discovered in 1978, is located 250 kilometers west of Stavanger. It will be developed with a two-slot template with an integrated manifold where the well stream will be connected to the existing Gina Krog platform through a 9.5-kilometer flexible flowline and integrated service umbilical.

The optional scope on Troll B includes a new 2.5-kilometer flexible flowline from an existing PLEM on Troll B to a new PLEM close to the Kvitebjørn Hot Tap. A rigid spool will also be fabricated and installed between the new PLEM and the Kvitebjørn Hot Tap.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Fossil EnergyOil & GasProduction & ProcessingSubseaBusiness & FinanceBusiness Developments & ProjectsEquipmentProject & Tenders

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Petrobras locks in 20-year US supply from Sempra’s LNG project in Lone Star State
  2. 2Hanwha Ocean’s design solution allowing LNG carrier’s switch to ammonia gets ABS’ thumbs-up
  3. 3Exmar’s FLNG conversion earns Bureau Veritas’ seal of approval
  4. 4Denmark opens EU’s first full-scale CO2 storage site

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free