Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Prysmian hits dynamic cables milestone
Business & Finance

November 1, 2023 · about 2 years ago

Prysmian hits dynamic cables milestone

Prysmian Group has completed the pre-termination phase for the dynamic cables destined for a floating offshore wind farm off the coast of France – said to be the company’s first turnkey project of a dynamic cables system for a floating wind farm. Prysmian announced the completion of the dynamic cabl

2 minutes read
  • LinkedIn
  • X
  • Email
Prysmian hits dynamic cables milestone

Prysmian Group has completed the pre-termination phase for the dynamic cables destined for a floating offshore wind farm off the coast of France – said to be the company’s first turnkey project of a dynamic cables system for a floating wind farm.

Prysmian announced the completion of the dynamic cables’ pre-termination phase for the Provence Grand Large floating wind farm, a key step that involved pre-installing dynamic cable accessories as well as innovative electrical and optical terminations onto each dynamic cable end that will enable fast and easy installation, disconnection and reconnection on the wind turbine floaters.

The pre-termination works took place at the company’s dynamic cable center of excellence in Nordenham, Germany, this summer. It is said to represent a milestone for Prysmian as this is the first time it is delivering dynamic 66 kV cables with innovative accessories that can “plug in and out” .

“This is an innovative development because it allows us to connect and disconnect easily, in a seamless way, which was not previously possible,” said Alessandro Pistonesi , Senior Project Manager at Prysmian.

“The floating wind industry is at its beginning, but we can foresee that disconnection will be part of normal maintenance cycles. So, we have redesigned our cable system package to respond to this request and to provide ease of management and handling for the end user.”

Provence Grand Large consists of three 8.4 MW turbines, the last of which was installed at the beginning of October at the site located about 17 kilometers from the coastal town of Port-Saint-Louis-du-Rhône near Marseilles in a water depth of about 100 meters.

Prysmian will connect the three turbines installed on floating foundations to the public electricity transmission grid via a 21-kilometer submarine cable and a 9-kilometer underground cable.

Once completed in early 2024, the floating offshore wind farm will provide 24 MW of renewable energy to more than 45,000 people in France.

This pilot project is being led by EDF Renewables, Enbridge and CPP Investments MC.

“In the dynamic system, the floating turbines are only connected by cables which can be disconnected. If the offshore wind generator has to be towed into port, to do heavy maintenance, because there was damage to the generator for whatever reason, our cable can be unplugged so the offshore generator is free to be moved,” Pistonesi said.

“We pre-installed the dynamic accessories into our factory so that when we pull the cable with the accessories already installed on the floating structure, we just plug it in. It’s a very short operation.”

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceBusiness Developments & ProjectsInnovationOutlook & StrategyProject & TendersTechnology

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

14 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

14 days ago