Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Survey campaign wraps up at 2 GW Scottish offshore wind site
Business & Finance

November 2, 2023 · about 2 years ago

Survey campaign wraps up at 2 GW Scottish offshore wind site

A geotechnical survey campaign has wrapped up at an offshore wind farm site in Scotland being developed by Ocean Winds, a joint venture between EDP Renewables and Engie. According to the project’s latest Notice to Mariners (NtM), the geotechnical survey within the Caledonia offshore wind farm site w

1 minutes read
  • LinkedIn
  • X
  • Email
Survey campaign wraps up at 2 GW Scottish offshore wind site

A geotechnical survey campaign has wrapped up at an offshore wind farm site in Scotland being developed by Ocean Winds, a joint venture between EDP Renewables and Engie.

According to the project’s latest Notice to Mariners (NtM), the geotechnical survey within the Caledonia offshore wind farm site was completed on October 31.

The activity was carried out by Gardline using the vessel Horizon Geoscience.

The geotechnical survey consisted of up to 40 sampling boreholes, including penetration to 60 meters below the seabed with sediment removal, up to 40 CPTs, and up to 20 P-S logging at borehole locations.

The site is located in the Moray Firth and is approximately 429 km2 in size, with the northern limit approximately 22 kilometers from Wick and the southern limit approximately 38 kilometers from Banff.

Ocean Winds announced at the end of July that geotechnical surveys had started at the offshore wind farm site.

In July last year, Ocean Winds revealed its plans to build out the Caledonia offshore wind farm to an installed generation capacity of 2 GW, with the supply chain commitments made to be reflective of the planned target capacity.

The project is adjacent to Ocean Wind’s operational Moray East development and its under-construction Moray West wind farm, which is planned to be up and running early in 2025.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceBusiness Developments & ProjectsOutlook & StrategyProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

25 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

25 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

25 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

25 days ago