Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›With replacement work underway, restart of TotalEnergies’ UK gas plant anticipated in fortnight’s time
Business & Finance

December 12, 2023 · about 2 years ago

With replacement work underway, restart of TotalEnergies’ UK gas plant anticipated in fortnight’s time

TotalEnergies is continuing its investigation into the failure of a heating system section at a gas plant on the north coast of the main island of the Shetland Isles.

2 minutes read
  • LinkedIn
  • X
  • Email
Greater Laggan Area; Source: TotalEnergies

France’s energy giant TotalEnergies is continuing its investigation into the failure of a heating system section at a gas plant on the north coast of the main island of the Shetland Isles that takes in gas from offshore fields on the UK Continental Shelf (UKCS). The plant is expected to come back online in two weeks.

After the failure of a heating medium system section resulted in a release of steam, TotalEnergies shut down its onshore Shetland Gas Plant , which is part of the giant West of Shetland project, last week and started an investigation into the incident.

The French player’s joint venture partner in the Greater Laggan Area (GLA) and co-owner of the Shetland Gas Plant, Kistos, said in an update on the recent shutdown of the plant that TotalEnergies was continuing to investigate the cause of the heating medium system failure.

Simultaneously, the oil major has started work to replace the failed section. Kistos underlines that both workstreams need to be completed to ensure the safe restart of the facility, which the firm expects to occur in the next two weeks.

While highlighting that it remains in regular contact with the operator and will provide further updates as appropriate, Kistos confirmed that its average production in 2023 was still expected to be within the previously guided range of 8,500 – 10,500 boe/d.

This plant is part of TotalEnergies’ West of Shetland gas project, covering the producing Greater Laggan Area (GLA) fields – Laggan , Tormore , Edradour , and Glenlivet gas fields – and the undeveloped Glendronach gas field, which are located up to 125 km northwest of the Shetland Islands.

The onshore gas plant was originally built to process gas from the Laggan–Tormore fields and supplies around 8% of the UK’s TotalEnergies gas consumption, representing enough gas for two million households.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceBusiness Developments & ProjectsExploration & ProductionOperations & MaintenanceProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

11 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

11 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

11 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

11 days ago