Norwegian shipyard Ulstein Verft has placed an order with ABB for the delivery of an integrated power and propulsion system for Nexans’ new cable-laying vessel (CLV), currently under construction.
The CLV, specially designed by Skipsteknisk, will be able to carry out the transport and lay of various types of subsea cables, including cable bundles, as well as recovery and repair, and will be capable of laying up to four cables simultaneously.
