Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Eidesvik and Agalas shake hands for low-emission Türkiye-built vessel
Business & Finance

February 19, 2024 · about 2 years ago

Eidesvik and Agalas shake hands for low-emission Türkiye-built vessel

Eidesvik Offshore and Agalas have entered into an agreement to build a new, low-emission construction support vessel (CSV) that will be equipped to perform inspection, maintenance and repair (IMR) work. The vessel will be owned by an entity to be named Eidesvik Agalas AS, where Eidesvik will be the

2 minutes read
  • LinkedIn
  • X
  • Email
The vessel Eidesvik

Eidesvik Offshore and Agalas have entered into an agreement to build a new, low-emission construction support vessel (CSV) that will be equipped to perform inspection, maintenance and repair (IMR) work.

The vessel will be owned by an entity to be named Eidesvik Agalas AS, where Eidesvik will be the majority owner with 50.1% and will have full management, while the remaining shares will be owned by Northern Norway shipowners Agalas.

Agalas, together with designer NSK Ship Design, has developed the highly flexible vessel that will be built at the Sefine Shipyard in Türkiye.

It will measure 99.9 meters in overall length with a breadth of 21 meters, will be able to accommodate 100 people, and will be equipped with a 150-metric tonne heave-compensated crane and a deck area of approximately 900 square meters.

Planned delivery is in early 2026, with an estimated build cost of €81.5 million. In addition, Eidesvik Agalas AS has been granted options for four additional vessels.

“By renewing our fleet with a low emission, favourably priced and versatile vessel we confirm our ability to deliver on our strategy. This vessel, along with the options for 4 additional vessels, will increase our capacity and competitive edge in the future energy mix,” said Gitte Gard Talmo , CEO and President of Eidesvik Offshore.

Financing is a combination of equity from both shareholders and around 70% debt financing from Sparebank 1 Nord-Norge and Eksfin. Eidesvik’s share of equity will come from cash on hand.

Upon completion, the vessel is scheduled to commence a three to five-year time charter with Reach Subsea .

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceBusiness Developments & ProjectsCollaborationGreen MarineInnovationOutlook & StrategyProject & TendersTransitionVesselsVision

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

12 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

12 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

12 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

12 days ago