Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Santos picks Australian player for work on Darwin LNG life extension project
Business & Finance

March 8, 2024 · about 2 years ago

Santos picks Australian player for work on Darwin LNG life extension project

Australian energy giant Santos has handed out an assignment on the Darwin LNG life extension project to UGL.

2 minutes read
  • LinkedIn
  • X
  • Email
FPSO BW Opal; Source: BW Offshore

Australia’s energy giant Santos has handed out an assignment on the Darwin LNG life extension project to UGL, a compatriot specialist end-to-end engineering and services provider and member of the CIMIC Group.

UGL will provide brownfield construction services for the life extension project of the Darwin facility, set to undergo pipeline tie-in work to extend its life for around 20 years. As a result, the gas production is poised to move from the Bayu-Undan gas field to the Barossa field located 300 kilometers off the coast of Darwin.

According to the Australian firm, the work will start immediately and 100 jobs will be created during the project’s lifecycle. The company emphasizes its commitment to Aboriginal engagement, local employment, supplier capability, and providing value to the communities in which they work.

Doug Moss , UGL’s Managing Director, pointed out: “UGL is looking forward to supporting the broader community through providing opportunities for local employment and local businesses to support the project.”

This deal solidifies the firm’s presence in the region, following the contract from August 2023 with the Department of Defense for strategic advice, planning, supply management, operations, and maintenance of the Australian Defense Force’s fuel network, which is present in the Northern Territory.

Juan Santamaria, CIMIC’s Executive Chairman, said: “UGL has a strong history of working with the world’s largest energy companies, as a leading provider of critical services to the energy sector, and we are pleased to support Santos on this project.”

Before Barossa came into the picture, Darwin LNG, the second LNG project in Australia and the first one in the country’s Northern Territory region, entailed the development and production of gas mainly from the Bayu-Undan field, which is located 250 km off the southern coast of East Timor and 500 km off Darwin, as well as the pipeline transport and liquefaction of that gas.

Thanks to the Barossa project, which encompasses a floating production storage and offloading (FPSO) vessel, subsea production wells, supporting subsea infrastructure, and a gas export pipeline tied into the existing Bayu-Undan to Darwin LNG pipeline, the Darwin LNG project will get a new lease on life.

The FPSO BW Opal , which will be used for natural gas production from the Barossa field, is currently under construction. Despite some legal setbacks , the development of the project is moving ahead.

Norway’s BW Offshore has made considerable progress in the construction of the FPSO and the first gas is scheduled for early 2025 .

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceBusiness Developments & ProjectsProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

23 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

23 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

23 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

23 days ago