Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo
Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Cabling›Greek firm completes cable installation for French floating wind pilot project
Cabling

April 25, 2024 · about 2 years ago

Greek firm completes cable installation for French floating wind pilot project

Greece-based Asso.subsea has completed the cable installation, burial, and protection operations for the Provence Grand Large floating offshore wind project in France. The Provence Grand Large floating offshore wind project is located 17 kilometers off the coast in the Mediterranean Sea, on a 100-me

2 minutes read
  • LinkedIn
  • X
  • Email
Provence Grand Large Asso.subsea
Source: Asso.subsea

Greece-based Asso.subsea has completed the cable installation, burial, and protection operations for the Provence Grand Large floating offshore wind project in France.

The Provence Grand Large floating offshore wind project is located 17 kilometers off the coast in the Mediterranean Sea, on a 100-meter deep site.

The floating wind pilot project features three Siemens Gamesa 8 MW wind turbines installed on tensioned line floats and designed by SBM Offshore and IFP Energies Nouvelles. The installation of the wind turbines was completed in October 2023.

Asso.subsea was entrusted with all marine works, including engineering, cable loading of export and inter-array dynamic cables, route preparation, cable installation and configuration of lazy wave, burial, and protection, along with Horizontal Directional Drilling (HDD) operations for the landing point.

By covering a cable distance of approximately 21,000 meters, the company connected France’s inaugural floating offshore turbines to the Port-Saint-Louis-du-Rhône station, generating electricity equivalent to the consumption of 45,000 people.

For the work, Asso.subsea deployed the cable-laying vessel (CLV) Atalanti, which was specially converted in 2023 for this project to create the required cableway for the dynamic cable installation.

In addition, the trenching support vessel (TSV) Argo was used during the operations, including AssoJet III Mk2, the latest addition to the company’s portfolio of jetting ROVs with a 1,5 kW of total power, tailored for deep-water subsea burial operations.

The inter-array cables, export cables, and onshore cables were provided by Prysmian Group under a contract signed with the developers in 2019.

The 24 MW Provence Grand Large floating offshore wind project is led by EDF Renewables in partnership with Enbridge Éolien France 2 S.à.r.l, a subsidiary of Enbridge Inc. and CPP Investments.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

CablingDeepwater InstallationGridOffshore WindSubseaWind FarmsBusiness Developments & ProjectsOperations & Maintenance

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1SED Energy Holdings and Ventura Offshore to unite into one
  2. 2New Boskalis rock installation vessel starts work offshore Poland
  3. 321 companies apply for Norway’s new oil & gas exploration areas
  4. 4Spanish shipyard launches its largest-ever vessel, built for Østensjø Rederi

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free