Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Authorities & Government›Woodside gearing up for decom activities at Australian offshore gas field
Authorities & Government

May 1, 2024 · about 2 years ago

Woodside gearing up for decom activities at Australian offshore gas field

Woodside has submitted an environment plan (EP) for subsea decommissioning activities at a gas field offshore Australia.

2 minutes read
  • LinkedIn
  • X
  • Email
Illustration; Source: Woodside

Australian energy giant Woodside has submitted an environment plan (EP) to the country’s offshore regulator for subsea decommissioning activities at a gas field in the offshore Otway Basin, close to the coast of Victoria, Australia.

The National Offshore Petroleum Safety and Environmental Management Authority (NOPSEMA) has confirmed that Woodside submitted an environment plan to undertake subsea decommissioning activities at the Minerva field , previously operated by BHP Petroleum (Victoria). This field is located in Commonwealth waters within petroleum license VIC/L22 and pipeline license VIC/PL33 .

Situated approximately 11 km south-southwest of Port Campbell, Victoria, the Minerva wells lie in water depths of around 50 – 60 meters. Woodside plans to remove all subsea infrastructure and equipment from the seabed associated with this field. The scope of the Minerva decommissioning and field management environment plan includes ongoing field management activities such as inspection and monitoring of the subsea and well infrastructure until final decommissioning.

The EP also entails the removal of the Minerva gas pipeline bundle in Commonwealth waters, which comprises approximately 4.9 km of 10-inch concrete-coated rigid-steel flowline, bunded with an electro-hydraulic umbilical and two 2-inch steel chemical injection lines and stabilization materials.

In addition, the environment plan covers the removal of Minerva subsea infrastructure within VIC-L22 consisting of five inline pipeline structures, five tie-in spools, and associated equipment and stabilization material. According to Woodside, the equipment removal activities are planned to start as early as 3Q 2024 and require about three to five months, subject to vessel availability and weather constraints. The Minerva gas field was discovered by BHP’s Minerva-1 in 1993 and the first gas was achieved in January 2005. The field’s production ceased in September 2019.

Recently, Woodside decided to keep its participating interests in oil and gas assets off the coast of Western Australia. Before this, the Australian heavyweight sold a 10% non-operating interest in the Scarborough Joint Venture, comprising the Scarborough gas field and associated offshore and subsea infrastructure, to LJ Scarborough, a subsidiary of LNG Japan.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Authorities & GovernmentBusiness & FinanceBusiness Developments & ProjectsEnvironmentRegulation & Policy

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

11 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

11 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

11 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

11 days ago