Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Fossil Energy›BW Energy ties up loose ends for acquisition of FPSO being redeployed at Brazilian field
Fossil Energy

May 3, 2024 · about 2 years ago

BW Energy ties up loose ends for acquisition of FPSO being redeployed at Brazilian field

BW Offshore has brought the sale of an FPSO vessel to an end, thanks to BW Energy upholding its end of the bargain.

2 minutes read
  • LinkedIn
  • X
  • Email
FPSO Polvo; Source: BW Offshore
FPSO Polvo; Source: BW Offshore

Norway’s FPSO operator BW Offshore has brought the sale of a floating production, storage, and offloading (FPSO) vessel to an end, thanks to BW Energy upholding its end of the bargain. This FPSO is destined for redeployment at a field off the coast of Brazil.

After BW Energy made up its mind to proceed with the Maromba development project offshore Brazil, the firm inked an agreement in April 2022 to buy the laid-up FPSO Polvo from BW Offshore for a price tag of $50 million with a plan to upgrade and redeploy it on the field.

The oil and gas company paid $30 million upon the vessel transfer date, with the remaining $20 million provided as a seller’s credit by the Norwegian FPSO operator. As BW Offshore has received the remaining $20 million plus interest, the firm has confirmed the closing of the FPSO sale. The FPSO Polvo, originally built for operation in Brazil’s Polvo field , completed 14 years of production before being demobilized in 2021. Following the acquisition by BW Energy, the vessel is currently set to undergo refurbishment in China, preparing for its forthcoming redeployment at the Maromba field.

Following the acquisition of interest from Petrobras and Chevron for a total of $115 million, BW Energy entered the Maromba project in 2019, and the development plan for the field is based on an initial three-well drilling campaign with planned first oil in 2025 and a second campaign with a further three wells in 2027.

The field’s total oil production at peak is anticipated to be between 30-40,000 barrels per day. With 1.2 million barrels of storage capacity, the FPSO Polvo will have a total liquid capacity of 85,000 barrels per day, an oil production capacity of 65,000 barrels per day, and a water treatment capacity of 75,000 barrels per day.

The completion of the sale of the FPSO Polvo comes shortly after BW Offshore removed another FPSO from its fleet, which is set to be recycled at Baijnath Melaram ship recycling facility in India.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Fossil EnergyFPSO & VesselsOil & GasBusiness & FinanceBusiness Developments & ProjectsExploration & Production

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Petrobras locks in 20-year US supply from Sempra’s LNG project in Lone Star State
  2. 2Hanwha Ocean’s design solution allowing LNG carrier’s switch to ammonia gets ABS’ thumbs-up
  3. 3Exmar’s FLNG conversion earns Bureau Veritas’ seal of approval
  4. 4Denmark opens EU’s first full-scale CO2 storage site

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free