Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business Developments & Projects›Offshore cable ops resume at Ireland-Wales interconnector after a break
Business Developments & Projects

May 22, 2024 · about 2 years ago

Offshore cable ops resume at Ireland-Wales interconnector after a break

Following a pause due to poor weather and vessel maintenance, offshore cable operations have resumed at the Greenlink interconnector that will link Ireland and Wales. Cable burial and trenching activities are ongoing along the interconnector route by the 127-meter-long DP2 offshore support vessel Gr

1 minutes read
  • LinkedIn
  • X
  • Email
Offshore cable ops resume at new UK interconnector following winter pause

Following a pause due to poor weather and vessel maintenance, offshore cable operations have resumed at the Greenlink interconnector that will link Ireland and Wales.

Cable burial and trenching activities are ongoing along the interconnector route by the 127-meter-long DP2 offshore support vessel Grand Canyon III, following the offshore cable installation with the cable lay vessel (CLV) Connector .

In parallel with the final cable burial activities, subsea rock installation operation activities will take place between May 26 and July 15, subject to weather and operational constraints.

The work will be carried out along the planned interconnector route between the landfall location near Freshwater West, Pembroke, Wales, and the landfall location near Baginbun Beach, Co. Wexford, Ireland, by subsea rock installation vessel Simon Stevin.

Cable burial or trenching activities, performed by Helix Robotics Solution on behalf of Jan De Nul , were paused in January due to poor weather and a requirement for maintenance and upgrades on the Grand Canyon III.

System testing for the Greenlink interconnector is set to begin in the summer of 2024 and commissioning is expected by the end of the year.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business Developments & ProjectsOutlook & StrategyProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

21 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

21 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

21 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

21 days ago