Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Fossil Energy›Brazilian FPSO comes back online post-maintenance
Fossil Energy

May 30, 2024 · about 2 years ago

Brazilian FPSO comes back online post-maintenance

Brazilian oil and gas player Enauta has resumed production from one of its FPSOs working on a field offshore Brazil.

1 minutes read
  • LinkedIn
  • X
  • Email
FPSO Petrojarl I; Source: Enauta
FPSO Petrojarl I; Source: Enauta

Brazilian oil and gas player Enauta has resumed production from one of its floating, production, storage, and offloading (FPSO) vessels working on a field offshore Brazil, following maintenance.

Enauta reported that production in the Atlanta field in Brazilian waters was restarted on May 25, 2024, following five-day maintenance on the FPSO Petrojarl I . The platform’s operational availability in 2024 is said to exceed 95%.

The Atlanta field has been producing oil since 2018. Operated by Enauta Energia, Enauta’s wholly-owned subsidiary, it is located in block BS-4 in the Santos Basin, at a 1,500-meter water depth.

Enauta is working on replacing the FPSO Petrojarl I with the FPSO Atlanta , which the company bought for Atlanta’s Full Development System (FDS) in 2022. The naming ceremony for the FPSO Atlanta was held at the Dubai Drydocks World shipyard on December 13, 2023.

The FPSO, which crossed oceans to reach Brazil from Dubai , arrived at the field on May 16 . Following its arrival, the activities to connect the wells to the vessel are ongoing .

FPSO Atlanta has the capacity to store 1.6 million barrels of oil and process 50,000 barrels of oil per day. The first oil is expected in August 2024, with six wells online, reaching ten wells in 2029.

Related Articles

Fossil Energy

Operation to connect subsea well infrastructure to Brazilian FPSO about to begin

2 min read

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Fossil EnergyFPSO & VesselsOil & GasBusiness & FinanceBusiness Developments & ProjectsExploration & ProductionProject & TendersVessels

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Petrobras locks in 20-year US supply from Sempra’s LNG project in Lone Star State
  2. 2Hanwha Ocean’s design solution allowing LNG carrier’s switch to ammonia gets ABS’ thumbs-up
  3. 3Exmar’s FLNG conversion earns Bureau Veritas’ seal of approval
  4. 4Denmark opens EU’s first full-scale CO2 storage site

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free