Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Fossil Energy›Brazilian oil field’s production grounds to a halt but restart anticipated this month
Fossil Energy

June 13, 2024 · about 2 years ago

Brazilian oil field’s production grounds to a halt but restart anticipated this month

Enauta has stopped production from a floating, production, storage, and offloading (FPSO) vessel working at its field offshore Brazil.

2 minutes read
  • LinkedIn
  • X
  • Email
FPSO Petrojarl I; Source: Enauta
FPSO Petrojarl I; Source: Enauta

Brazilian oil and gas player Enauta has stopped production from a floating, production, storage, and offloading (FPSO) vessel working on at its field off the coast of Brazil.

A production stoppage has been initiated for the FPSO Petrojarl I , which has been deployed at the Atlanta field in Brazilian waters since 2018, to carry out adjustments related to selected equipment maintenance after inspections at the process plant.

The Enauta Energia-operated Atlanta field is located in block BS-4 in the Santos Basin, at a 1,500-meter water depth. According to the operator, production at the field is expected to resume in the next weeks of June 2024.

Currently, the Brazilian firm is working on replacing the FPSO Petrojarl I with the FPSO Atlanta , which was bought for Atlanta’s Full Development System (FDS) in 2022. The naming ceremony for the FPSO was held at the Dubai Drydocks World shipyard on December 13, 2023.

The vessel reached Brazil in May 2024 , enabling the start-up of activities to connect the FPSO to the wells at the field. With 19 out of 20 anchor installations completed, activities to connect the first two wells to the FPSO Atlanta are slated to kick off next week.

Related Articles

Fossil Energy

Operation to connect subsea well infrastructure to Brazilian FPSO about to begin

2 min read

Enauta believes that all operations are on track to enable the first oil from the FPSO Atlanta in August 2024, initially with six wells online, reaching ten wells in 2029. This FPSO can store 1.6 million barrels of oil and process 50,000 barrels of oil and 140,000 barrels of water per day.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Fossil EnergyFPSO & VesselsOil & GasBusiness & FinanceBusiness Developments & ProjectsExploration & Production

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Petrobras locks in 20-year US supply from Sempra’s LNG project in Lone Star State
  2. 2Hanwha Ocean’s design solution allowing LNG carrier’s switch to ammonia gets ABS’ thumbs-up
  3. 3Exmar’s FLNG conversion earns Bureau Veritas’ seal of approval
  4. 4Denmark opens EU’s first full-scale CO2 storage site

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free