Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›With natural gas cooling equipment drawing near, Canada LNG export terminal on track for first cargo in mid-2025
Business & Finance

August 8, 2024 · about 1 year ago

With natural gas cooling equipment drawing near, Canada LNG export terminal on track for first cargo in mid-2025

LNG Canada, a joint venture between Shell, Petronas, PetroChina, KOGAS, and Mitsubishi, is awaiting the arrival of refrigerants in the form of liquified petroleum gas that will be used for cooling the natural gas delivered to its future liquefied natural gas (LNG) export facility in Kitimat, Canada’

2 minutes read
  • LinkedIn
  • X
  • Email
GasChem Atlantic gas tanker

LNG Canada, a joint venture between Shell, Petronas, PetroChina, KOGAS, and Mitsubishi, is awaiting the arrival of refrigerants in the form of liquified petroleum gas that will be used for cooling the natural gas delivered to its future liquefied natural gas (LNG) export facility in Kitimat, Canada’s British Columbia.

Commissioning and start-up activities for the LNG Canada project are in full swing as developers say that Phase 1 of the LNG export facility in Kitimat is more than 90% complete. The forthcoming activities include taking delivery of a shipment of refrigerants arriving onboard the Gaschem Atlantic – a 2009-built gas tanker with a capacity to hold 8,500 cubic meters (cbm) owned by Hamburg-based GasChem Services.

Starting from the Delaware River in Pennsylvania, the ship crossed the Panama Canal to reach British Columbia’s Pacific coast. It was set to be anchored at the Port of Prince Rupert in early August before arriving at the LNG Canada marine terminal for unloading.

These refrigerants will be used to cool natural gas delivered to LNG Canada via the Coastal GasLink pipeline, thus minimizing flaring activities. Once the facility is up and running, the JV intends to produce its own refrigerants. As flaring is scheduled to start in August, the partners are convinced that the first ship carrying LNG produced onsite can be expected by mid-2025.

This comes on the heels of another milestone – the final weld being placed on the plant’s first production train a month ago. With an initial capacity to produce 12.7 metric tonnes (14 million tons) of LNG per year, the Kitimat facility will comprise, among other things, a natural gas receiving and LNG production unit, a marine terminal for two LNG carriers, a tugboat dock, and LNG loading lines.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceBusiness Developments & ProjectsEquipment

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Deepsea Nordkapp rig; Source: Odfjell Drilling
Business & Finance

Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year

10 days ago

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

11 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

11 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Deepsea Nordkapp rig; Source: Odfjell Drilling
Business & Finance

Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year

10 days ago
FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

11 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

11 days ago