Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo

© 2026 Navingo. All rights reserved.

Home›Business Developments & Projects›USV fleet deployed at Dogger Bank D offshore wind farm site for geophysical survey
Business Developments & Projects

August 12, 2024 · about 2 years ago

USV fleet deployed at Dogger Bank D offshore wind farm site for geophysical survey

A multibeam echosounder (MBES) geophysical survey of the Dogger Bank D offshore wind site, using several uncrewed surface vessels (USVs), is scheduled to start on August 13. According to information in the project’s Notice to Mariners, XOCEAN will deploy multiple USVs to survey the wind turbine arra

2 minutes read
  • LinkedIn
  • X
  • Email
XOCEAN launches new unmanned surface vehicle

Share this article

A multibeam echosounder (MBES) geophysical survey of the Dogger Bank D offshore wind site, using several uncrewed surface vessels (USVs), is scheduled to start on August 13.

According to information in the project’s Notice to Mariners, XOCEAN will deploy multiple USVs to survey the wind turbine array site and the export cable route. The USVs will be mobilized from Scarborough or Hartlepool Harbour where each vessel will be escorted out of the harbor limits, before transiting to the survey area.

The survey works will continue until December 31 when all locations have been surveyed.

The site where the Dogger Bank D offshore wind project is planned to be built is located some 210 kilometres off the UK’s northeast coast, in the eastern zone of the Dogger Bank C lease area.

The project, developed by Equinor and SSE Renewables, is the fourth phase of what is already the world’s biggest offshore wind farm under construction, the 3.6 GW Dogger Bank Wind Farm, and could add a further 2 GW of generation capacity to the development.

In June this year, the developers submitted a Scoping Report for the 2 GW project to the UK’s Planning Inspectorate in preparation for carrying out an Environmental Impact Assessment (EIA) that is required for submitting a Development Consent Order (DCO) application.

According to information on the UK’s Planning Inspectorate website , SSE and Equinor are expected to file an application for a DCO in the first quarter of 2025.

In July, Dogger Bank D developers and The Crown Estate established the commercial terms of a proposed variation of the existing Dogger Bank C seabed lease where the two partners plan to build the new offshore wind farm.

If the Dogger Bank D project is approved, it will enter construction in 2029, at the earliest, subject to obtaining all necessary approvals and permits.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business Developments & Projects

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free