Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Authorities & Government›Oil production at Brazilian offshore field comes to a halt with restart date still unknown
Authorities & Government

September 9, 2024 · about 1 year ago

Oil production at Brazilian offshore field comes to a halt with restart date still unknown

Brava Energia has shut down production at an oil field in the Campos basin off the coast of Brazil. The timeline for the resumption of production remains elusive.

2 minutes read
  • LinkedIn
  • X
  • Email
FPSO P-63; Source: Petrobras

Brazilian energy player Brava Energia, former 3R Petroleum before the merger with Enauta, has shut down production at an oil field in the Campos basin off the coast of Brazil. The timeline for the resumption of production remains elusive.

Following a request from Agência Nacional do Petróleo, Gás Natural e Biocombustíveis (ANP) for information regarding its platform operating systems, the production at the Papa Terra field was stopped on the night of September 4.

Previously, the production at the field was resumed on August 29, 2024, once a scheduled stoppage for maintenance was completed as part of a campaign to revitalize equipment, which began in May 2024, aiming to improve the asset’s efficiency, reliability, and operational safety.

After the resumption of operations, production from the Papa Terra field stabilized at around 15,000 barrels of oil equivalent per day through six wells: PPT-12, PPT-16, PPT-17, PPT-22, PPT-37, and PPT-50. However, the PPT-51 well is under intervention to replace the pump.

There is no set resumption date so far. Petrobras sold the field to 3R Petroleum in December 2022. The Papa Terra field, part of the BC-20 concession and located at a water depth of 1,200 meters, started operating in 2013.

The field’s oil production is done through two units, P-61 of the tension leg wellhead platform (TLWP) type and P-63 , which is an FPSO type, where all the production is processed. Constellation recently signed an agreement to sublet the Alpha Star rig for 30 days during the ongoing contract with Brava Energia, which enabled the rig to work on the Papa Terra field.

Based on ANP’s recent ‘ 2023 Annual Exploration Report ,’ the investments in the exploration phase of E&P contracts could reach around R$10 billion (over $1.78 billion) in 2024. The report also provides insights into investments planned for the exploration phase from 2024 to 2027, based on the exploration work plans (PTEs) for 2024 submitted to ANP by companies holding E&P contracts.

From 2024 to 2027, a total of R$18.31 billion (about $3.26 billion) is planned for investments in the exploration phase with 2024 accounting for the largest share, R$9.97 billion (more than $1.77 billion), followed by 2025, with R$7.64 billion (around $1.36 billion), and finally, the years 2026 and 2027, with an expected R$701 million ($124.76 million) in investments. The distribution of investments from 2024 to 2027 based on activities shows that 88% will be concentrated in well drilling, for which R$16.04 billion (almost $2.85 billion) is forecast, while the remaining 12% (R$2.27 billion or $403.7 million) will be distributed between well testing (8%), exclusive geophysical survey (3%) and non-exclusive geophysical survey (1%).

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Authorities & GovernmentBusiness & FinanceBusiness Developments & ProjectsExploration & ProductionRegulation & Policy

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

12 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

12 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

12 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

12 days ago