Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business Developments & Projects›Geotechnical survey wraps up for first phase of South Korean floating wind project
Business Developments & Projects

October 1, 2024 · about 1 year ago

Geotechnical survey wraps up for first phase of South Korean floating wind project

Korea Floating Wind (KF Wind), owned by Ocean Winds, Mainstream Renewable Power, and Kumyang Electric Co., has completed the geotechnical survey for the first phase of its 1,125 MW floating offshore wind project in South Korea. The first phase of the project, called East Blue Power, has a potential

2 minutes read
  • LinkedIn
  • X
  • Email
Geotechnical survey wraps up for first phase of South Korean floating wind project

Korea Floating Wind (KF Wind), owned by Ocean Winds, Mainstream Renewable Power, and Kumyang Electric Co., has completed the geotechnical survey for the first phase of its 1,125 MW floating offshore wind project in South Korea.

The first phase of the project, called East Blue Power, has a potential capacity of 375 MW and is being developed approximately 80 kilometers off the coast of Ulsan.

The geotechnical survey was carried out for approximately one month by Geo Mariner, a specialized geotechnical survey vessel.

The results of the survey campaign are said to provide insights into seabed conditions that will guide the future location of the wind turbines, the design of the floating foundations and the offshore substation, as well as the planning of the submarine cable routes.

“The successful completion of the geotechnical survey is essential for a floating offshore wind project like ours. Thanks to our dedicated teams, we have gathered critical information to ensure a viable and secure development in terms of technical, environmental, and safety aspects”, said Austin Park , KF Wind’s project director.

Two floating offshore wind projects are being developed by KF Wind, namely the 750 MW KFW project and the 375 MW East Blue Power project.

The KF Wind and the East Blue Power floating offshore wind farms, totaling approximately 1,125 MW, have recently secured the Environmental Impact Assessment (EIA) approval from the Ministry of Environment for the totality of the two-phase project.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business Developments & ProjectsOperations & MaintenanceResearch & Development

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

10 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

10 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

10 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

10 days ago