Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business Developments & Projects›Seaspan’s LNG bunker vessel Garibaldi to take first cargo in Vancouver
Business Developments & Projects

October 8, 2024 · about 1 year ago

Seaspan’s LNG bunker vessel Garibaldi to take first cargo in Vancouver

Seaspan Energy’s first LNG bunkering vessel, the Seaspan Garibaldi (Nch’kay), is on its way to Vancouver, where it will take its first cargo and finalize commissioning.

2 minutes read
  • LinkedIn
  • X
  • Email
Seaspan’s LNG bunker vessel Garibaldi to take first cargo in Vancouver

Seaspan’s first LNG bunkering vessel, the Seaspan Garibaldi (Nch’kay), is on its way to Vancouver, where it will take its first cargo and finalize commissioning.

The vessel, which was delivered to Seaspan by CIMC SOE in August 2024, will then perform its first ship-to-ship bunkering in Long Beach. This is where the company said it will provide simultaneous operations to bunker a series of vessels.

Following the bunkering, the Seaspan Garibaldi will continue to provide low-carbon solutions to vessels on the West Coast of North America and will be joined by the company’s second LNG bunkering vessel, the Seaspan Lions (Ch’ich’iyúy Elxwíkn) .

To note, 7,600 cbm Seaspan Garibaldi is able to travel at a speed of 13 knots and is classed by Bureau Veritas (BV).

Designed in cooperation with VARD Marine, the vessel features an advanced DC power distribution system and is equipped with three dual-fuel generators for power supply. Two 1,600 kW azimuth thrusters provide propulsion, and there is provision for battery installation.

The vessel comes with two tanks comprising TGE Marine Gas Engineering’s fuel gas system, intank and cargo pumps for each tank, as well as two compressor systems for boil-off gas (BOG) handling.

It is equipped with a subcooler unit, which is controlled by a TGE Marine control system supporting the maintenance of the tank pressure besides BOG treatment. It also has a static and dynamic custody transfer system and various manifolds that enable full flexibility of bunkering operations.

The construction of the vessel began in February 2023, and the launching ceremony was held in December 2023.

To remind, CIMC SOE signed an agreement with Seaspan for the construction of two 7,600 cbm LNG bunker vessels, with the option for a third vessel, in May 2022.

The remaining two vessels, Seaspan Lions and Seaspan Baker , were launched in April and July of 2024, respectively. Seaspan Lions is scheduled for delivery in 2024 while Seaspan Baker will arrive in 2025.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business Developments & ProjectsVessels

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

17 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

17 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

17 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

17 days ago