Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Construction begins for NKT’s second cable layer with steel-cutting in Romania
Business & Finance

November 6, 2024 · about 1 year ago

Construction begins for NKT’s second cable layer with steel-cutting in Romania

Danish power cable manufacturer and installation company NKT has cut the first steel for its new cable-laying vessel (CLV) which will be able to run on both methanol and HVO/marine diesel oil. The milestone was celebrated at Vard’s shipyard in Romania where the construction, planning and engineering

1 minutes read
  • LinkedIn
  • X
  • Email
Construction begins for NKT's second cable layer with steel-cutting in Romania

Danish power cable manufacturer and installation company NKT has cut the first steel for its new cable-laying vessel (CLV) which will be able to run on both methanol and HVO/marine diesel oil.

The milestone was celebrated at Vard’s shipyard in Romania where the construction, planning and engineering design are being carried out for NKT Eleonora.

To remind, on the back of a record order backlog and strong market outlook, NKT announced investments in the new vessel, as well as in a new high-voltage factory on the existing site in Karlskrona, Sweden, in May 2023, with both assets expected operational from 2027.

It was reported yesterday, November 5, that the new cable extrusion tower in Karlskrona had reached its full height of 200 meters , becoming the second tallest tower in the Nordics.

As for NKT Eleonora, the vessel will feature Wärtsilä 32 methanol engines. Wärtsilä is also supplying the front tunnel and azimuth thruster, NOV REMACUT the cable lay system, cranes and mission equipment, and ABB will deliver its Onboard DC Grid power distribution system.

The 176-meter-long CLV was designed by Salt Ship Design. Equipped with three turntables, it will offer a cable-laying capacity of 23,000 tonnes.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceBusiness Developments & ProjectsInnovationOutlook & StrategyProject & TendersVessels

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

12 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

12 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

12 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

12 days ago