Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Equinor, LS Cable & System ink South Korean floating wind agreement
Business & Finance

November 6, 2024 · about 1 year ago

Equinor, LS Cable & System ink South Korean floating wind agreement

LS Cable & System has signed a memorandum of understanding (MoU) with Norway’s Equinor for cooperation on the 750 MW Bandibuli/Firefly floating offshore wind project in South Korea. According to LS Cable & System, the company has developed South Korea’s first dynamic submarine cable for floating off

1 minutes read
  • LinkedIn
  • X
  • Email
Equinor LS Cable & System

LS Cable & System has signed a memorandum of understanding (MoU) with Norway’s Equinor for cooperation on the 750 MW Bandibuli/Firefly floating offshore wind project in South Korea.

According to LS Cable & System, the company has developed South Korea’s first dynamic submarine cable for floating offshore wind, which is being considered for introduction through this collaboration.

Equinor signed a memorandum of understanding with Ulsan City in May 2019 for the development of the Firefly/Bandibuli floating wind farm offshore Ulsan, planned to be built 70 kilometers off the Ulsan coast across two sites, each covering 75 square kilometers.

The company received approval for the Environmental Impact Assessment (EIA) for the project in July, allowing the wind farm to participate in the fixed-price contract auction for wind power projects.

In addition, the wind farm recently entered into a Transmission Service Agreement (TSA) with Korea Electric Power Corporation (KEPCO).

The project is planned to feature Siemens Gamesa 15 MW wind turbines, with plans to assemble the nacelles locally under an agreement Equinor signed with Siemens Gamesa in October.

The South Korean government recently opened a tender for 2.8 GW of wind and solar energy capacity, 1.5 GW of which is being sought through offshore wind.

Last month, Korea’s Energy Agency’s Renewable Energy Center issued an invitation to tender which seeks to award 1 GW of fixed-bottom offshore wind and 500 MW of floating wind projects.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceBusiness Developments & ProjectsTechnology

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

12 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

12 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

12 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

12 days ago