Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Under $1.9B contract, Saipem joins TechnipFMC at TotalEnergies’ oil project in Suriname
Business & Finance

November 14, 2024 · about 1 year ago

Under $1.9B contract, Saipem joins TechnipFMC at TotalEnergies’ oil project in Suriname

After news that TechnipFMC had secured a $1 billion contract for the project, Saipem has reported a $1.9 billion win for TotalEnergies’ GranMorgu oil development offshore Suriname. Saipem has secured an engineering, procurement, construction, and installation (EPCI) contract by TotalEnergies EP Suri

2 minutes read
  • LinkedIn
  • X
  • Email
Under $1.9B contract, Saipem joins TechnipFMC at TotalEnergies' oil project in Suriname

After news that TechnipFMC had secured a $1 billion contract for the project, Saipem has reported a $1.9 billion win for TotalEnergies’ GranMorgu oil development offshore Suriname.

Saipem has secured an engineering, procurement, construction, and installation (EPCI) contract by TotalEnergies EP Suriname B.V. for the subsea development of the GranMorgu project, located in the Block 58 oil & gas field, 150 kilometers off the coast of Suriname.

The work includes the engineering, procurement, supply, construction, installation, pre-commissioning and assistance for the commissioning and start-up of the subsea umbilicals, risers and flowlines (SURF) package.

This comprises the EPCI of approximately 100 kilometers of 10” to 12” subsea production flowlines, 90 kilometers of 8” to 12” water and gas injection lines, and the T&I of flexible risers, umbilicals and associated structures, at water depths ranging from 100 to 1,100 meters.

For the offshore campaign, taking place in 2027 and 2028, Saipem will deploy a combination of S-Lay and J-Lay vessels.

The project will be executed in cooperation with TechnipFMC, which is in charge of the subsea production system (SPS) and flexible risers and umbilical equipment packages , to optimize the integration between ​the mutual scopes of work, building on the collaborative model of the commercial alliance the two companies created in 2021 for the pursuit of subsea projects including integrated SURF-SPS developments.

According to Saipem, the contract is an important one, contributing to the overall fleet booking until 2028 with its long-term commitment.

TotalEnergies is the operator of Block 58 with a 50% interest, with APA Corporation holding the other half, however, Staatsolie intends to exercise its option to enter the development with up to 20% interest.

The FID for the project was reached last month . With the construction and installation phases estimated to take approximately four years, the first oil is anticipated in 2028 at the earliest.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceBusiness Developments & ProjectsEquipmentExploration & ProductionProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

10 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

10 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

10 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

10 days ago