Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Proserv wins more work on world’s largest offshore wind farm
Business & Finance

December 10, 2024 · about 1 year ago

Proserv wins more work on world’s largest offshore wind farm

Proserv has been awarded a contract by DEME Offshore to de-risk offshore wind operations at Dogger Bank C, the third phase of the 3.6 GW Dogger Bank Wind Farm project in the UK. According to Proserv, the company will utilize its Electro Cable Guard (ECG) system to identify signs of transmission cabl

2 minutes read
  • LinkedIn
  • X
  • Email
Proserv's new cable monitoring system to debut on world's largest offshore wind project

Proserv has been awarded a contract by DEME Offshore to de-risk offshore wind operations at Dogger Bank C, the third phase of the 3.6 GW Dogger Bank Wind Farm project in the UK.

According to Proserv, the company will utilize its Electro Cable Guard (ECG) system to identify signs of transmission cable failure far earlier, allowing proactive measures to be carried out to avoid costly outages.

Under a contract with DE ME , Proserv will deploy its proprietary technology at the 1.2 GW Dogger Bank C project, enhancing asset reliability through earlier failure detection and prevention.

Using passive electrical sensors to monitor inter-array cables, supplied by Hellenic Cables, and terminations, ECG is said to deliver early fault detection that traditional systems overlook, transforming maintenance strategies and strengthening resilience in offshore operations.

It works by permanently and synchronously monitoring the combined effect of electrical and mechanical stresses on power cables and terminations to identify failure precursors far earlier, providing real-time insights into transmission system health.

“This latest evolution of our ECG system offers substantial cost savings benefits to developers and operators, addressing the widespread issue of cable failures, which account for approximately 80% of wind-farm related insurance claims. Unlike conventional methods, our solution embeds passive optical electrical sensors directly within terminations, eliminating the need for additional power and telecoms infrastructure at each termination point,” said Paul Cook , Proserv’s Vice President of Renewables.

The company’s ECG is currently being deployed at Dogger Bank A and Dogger Bank B , as well as Hywind Scotland , the world’s first floating offshore wind farm, and Hywind Tampen , with additional projects in the pipeline.

The Dogger Bank C contract will be project managed, engineered, and delivered by Proserv’s Great Yarmouth-based team, in addition to work being carried out at the wind farm’s A and B phases.

Located 130 kilometers off the Yorkshire coast, Dogger Bank Wind Farm is being built in three phases with 277 turbines in total – 95 at both Dogger Bank A and Dogger Bank B, and 87 at Dogger Bank C.

Set for completion in 2027, the project, owned by a consortium of SSE Renewables, Equinor, and Vårgrønn, will become the world’s largest offshore wind farm, powering six million UK homes with clean energy annually.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceBusiness Developments & Projects

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

22 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

22 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

22 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

22 days ago