Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Saipem getting an assist from ABL at gas project offshore Africa
Business & Finance

February 4, 2025 · about 1 year ago

Saipem getting an assist from ABL at gas project offshore Africa

ABL, part of Oslo-listed energy and marine consultancy ABL Group, has been hired to support Saipem, an Italian engineering, drilling, and construction services giant, with the development of a natural gas project off the coast of Libya, North Africa.

3 minutes read
  • LinkedIn
  • X
  • Email
Bouri field; Source: Mellitah Oil & Gas Libyan Branch

ABL, part of Oslo-listed energy and marine consultancy ABL Group, has been hired to support Saipem, an Italian engineering, drilling, and construction services giant, with the work on a natural gas project off the coast of Libya, North Africa.

Saipem secu red a $1 billion engineering, procurement, construction, installation, and commissioning (EPCIC) contract in August 2023 with Mellitah Oil & Gas Libyan Branch, a consortium formed by National Oil Corporation of Libya and Eni North Africa , to refurbish platforms and facilities at the Bouri gas field , as part of the Bouri Gas Utilization Project (BGUP).

Thanks to a contract for marine warranty survey (MWS) services, ABL will support the marine transportation and installation (T&I) operations related to Libya’s BGUP, which envisages an upgrade of offshore platforms and facilities, improving the field’s overall carbon footprint with significant reductions of its CO2 emissions.

Sergio Leone , ABL’s MWS Project Manager and Business Development Manager, highlighted: “We are really pleased to be appointed to support Saipem on this project – following a long history of successful collaboration with the company. The BGUP project seeks to improve delivery and production of natural gas to Libya, with potential to supply further in North Africa. It is an important energy infrastructure project for North Africa as a whole.”

Located 120 kilometers northwest of Tripoli at 145 to 183 meters of water depth, the Bouri field is part of Block NC-41, which is situated north of the Libyan coast in the Mediterranean Sea. The Saipem 7000 semi-submersible crane vessel will handle the main heavy lift operations.

Saipem’s work on this project covers the EPCIC of an approximately 5,000-ton gas recovery module (GRM) onto the existing DP4 offshore facility, together with the laying of 28 km of pipelines connecting the DP3 , DP4, and Sabratha platforms. However, ABL will undertake technical reviews and approvals of all project documentation, drawings, and calculations for warranted marine operations.

The Norwegian player’s scope of work entails suitability surveys and other marine assurance deliverables related to the proposed fleet, alongside any potential DP trials, where required. The firm will also provide on-site attendance to review and approve warranted marine operations.

Shai Tzucker , Energy Operations Director for ABL in Europe and West Africa, explained: “Whilst the project will be managed from our operational HQ in London, on-site attendances and vessel surveys will be supported by our extensive marine surveyor footprint across Europe and North Africa. We also benefit from an established market presence and MWS track-record in neighbouring Egypt.”

Mellitah Oil & Gas recently disclosed the availability of an engineering, procurement, construction, and commissioning (EPCC) assignment for the expansion of another production facility offshore Libya, inviting firms to participate in its tender, which is expected to be open from 4Q 2024 to 3Q 2025, with work scheduled to start in 4Q 2025.

ABL won multiple MWS deals in 2024, including the one with TenneT for the installation of three 2 GW export cable systems in the Netherlands.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceBusiness Developments & ProjectsProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

19 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

19 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

19 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

19 days ago