Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business Developments & Projects›ITM Power’s electrolyzer solution picked for Agder hydrogen project in Norway
Business Developments & Projects

February 13, 2025 · about 1 year ago

ITM Power’s electrolyzer solution picked for Agder hydrogen project in Norway

ITM Power has signed a contract to supply four NEPTUNE V units, totalling 20 MW, for the first phase of Norway’s Hydrogen Hub Agder project.

2 minutes read
  • LinkedIn
  • X
  • Email
ITM Power’s electrolyzer solution picked for Agder hydrogen project in Norway

UK’s electrolyzer manufacturer ITM Power has signed a contract to supply four NEPTUNE V units, totalling 20 MW, for the first phase of Norway’s Hydrogen Hub Agder project, 100% owned by Norwegian energy company Greenstat, a subsidiary of independent multi-energy producer La Française de l’Energie SA (FDE).

NEPTUNE V is ITM Power’s full-scope 5 MW containerized green hydrogen plant, which utilizes the company’s TRIDENT stack technology. Reportedly, it provides “reliable, flexible, and highly efficient hydrogen production capacity and the industry’s smallest footprint per MW.”

Dennis Schulz, CEO of ITM, commented: “The Nordic countries present an exciting opportunity for green hydrogen, and it is a privilege that FDE has selected us for the Agder Hydrogen Hub in Norway.”

Antoine Forcinal, CEO of FDE, said: “We are delighted to work with ITM as a partner for the supply of an integrated electrolyser solution for our Agder Hydrogen Hub project, one of the largest green hydrogen projects in Norway.”

To note, the first phase of the Hydrogen Hub Agder project, with a capacity of 20 MW and a production of up to 8 tonnes of hydrogen per day, is currently being realized in cooperation with multiple partners.

With a planned building period of two years, hydrogen is expected to be available for the maritime and heavy transport sectors by the end of 2026.

The second phase is expected to be an additional 40 MW, which is planned to be launched in 2027.

In other news, in 2025, an undisclosed European energy company contracted ITM Power to jointly develop a standard design configuration for a 10 MW green hydrogen production plant. As disclosed, the customer intends to deploy this plant design in several projects across the UK.

It is also worth mentioning that, in late 2024, the company concluded a technical milestone in electrolyzer technology development, having validated an additional 40% iridium loading reduction whilst maintaining stack performance and longevity.

Schulz stated at the time: “As a costly raw material, reducing iridium benefits stack costs significantly. This loading reduction and our catalyst recovery and reuse processes will substantially reduce our consumption of critical raw materials and further lower our cost.”

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business Developments & ProjectsExploration & ProductionProject & TendersResearch & DevelopmentTechnology

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

11 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

11 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

11 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

11 days ago