Woodfibre Management, a privately held Canadian company based in Vancouver, is moving forward with the construction works at its operated multimillion-dollar liquefied natural gas (LNG) export project along the southwest coast of British Columbia, Canada.
As construction continues to advance at the Woodfibre LNG site, including work on foundations for the LNG processing equipment and modules that are expected to begin arriving at the site in 2025, the operator underlines that the current work includes backfilling and grading of the site, concrete pouring, installation of rock anchors, and onshore casing advancement for the floating storage tank mooring structures.
