Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Bad weather postpones offshore installation ops at Türkiye’s gas field
Business & Finance

April 11, 2025 · about 1 year ago

Bad weather postpones offshore installation ops at Türkiye’s gas field

Trillion Energy is keen on resuming gas lift compressor installation activities next week at its giant gas field in the Black Sea off the coast of Türkiye.

2 minutes read
  • LinkedIn
  • X
  • Email
Akçakoca production platform; Source: Trillion Energy

Canada’s oil and gas player Trillion Energy is keen on resuming gas lift compressor installation activities next week at its giant gas field in the Black Sea off the coast of Türkiye.

Trillion scheduled the restart of activities at its SASB offshore gas project after Ramadan in Türkiye’s section of the Black Sea. These operations were slated to resume last week, as the firm decided to follow the installation of velocity string tubing in six natural gas wells with measures for artificial lift.

To this end, the company decided on a gas lift compressor system and pumps for the Akcakoca platform . In an update on the progress of its compressed natural gas (CNG) compressor initiative, Trillion revealed that the CNG compressor project was advancing steadily.

According to the Canadian player, the gas lift compressor system was transported to the Akcakoca production platform after final adjustments. However, weather conditions have interfered with the advancement of the planned work.

“Due to severe weather from April 11 to 13, the gas lift compressor installation is scheduled to start on Monday, April 14. The crew requires two days to install, test, and monitor the system,” elaborated Trillion.

After becoming operational, the compressor is expected to enable continuous gas lift injection into select wells to stabilize production. SASB is a conventional gas field in the Southwestern Black Sea, entailing numerous conventional natural gas pools in shallow water.

Trillion is redeveloping the field with a planned multi-well program that kicked off in 2022. Phase B outlines the target to have six producing wells by Q3 2025, out of which five are development wells and one is a stratigraphic well. Two sidetracks are planned to be drilled.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceBusiness Developments & ProjectsExploration & Production

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

15 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

15 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

15 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

15 days ago