Prysmian started installing the export cables in 2023 using its Leonardo da Vinci vessel. This also marked the start of the offshore construction of the 1.4 GW wind farm, whose export cable link runs from the offshore converter platform to a landfall point 220 kilometers away in Redcar, Teesside.
Related Article
Offshore construction begins on RWE’s Sofia offshore wind farm
Offshore construction at the Sofia project site, 195 kilometers off the UK coast, is still underway, with more than half of the monopiles installed and the first wind turbines now also in place.
The 1.4 GW project, which will comprise 100 Siemens Gamesa 14 MW turbines, is expected to be commissioned in 2026, when it will be capable of generating enough electricity to power the equivalent of 1.2 million UK homes.
