Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business Developments & Projects›May 2025 auction date set for Italian FSRU’s regasification slots
Business Developments & Projects

April 18, 2025 · about 1 year ago

May 2025 auction date set for Italian FSRU’s regasification slots

Italy’s floating regasification terminal operator OLT Offshore LNG Toscana, controlled by Snam and Igneo Infrastructure Partners, will hold auctions for regasification capacity at its floating storage and regasification unit (FSRU).

2 minutes read
  • LinkedIn
  • X
  • Email
A large vessel at sea

Italy’s floating regasification terminal operator OLT Offshore LNG Toscana, controlled by Snam and Igneo Infrastructure Partners, intends to hold auctions for regasification capacity at its floating storage and regasification unit (FSRU) moored off the coast of Livorno.

The Italian player disclosed that the continuous capacity products for multi-year allocation of slots at its FSRU Toscana , from gas year 2027/2028 to 2043/2044, will be scheduled from May 21, 2025. The regasification capacity will be offered in 165,000 liquid cubic meter slots, available in three products. A first, longer-term product covers the period from gas year 2027/2028 to 2041/2042, followed by a second shorter-term product from gas year 2027/2028 to 2036/2037. Finally, a third capacity product will run from gas year 2027/2028 to 2030/2031.

OLT Offshore pointed out that it will be possible to request the extension of the allocation to the following gas years, at the same allocation price and for the same number of slots allocated in the product, in case of remaining available capacity.

This follows the 20-year extension for the FSRU’s operation secured last month , when it was announced that the terminal’s annual regasification capacity of 5 billion standard cubic meters is fully booked until 2026/2027.

FSRU Toscana, moored about 22 kilometers off the coast between Livorno and Pisa, is connected to the national grid through a 36.5-kilometer long pipeline. Operated and managed by Snam, the pipeline has a 29.5 kilometer-long section at sea, 5 in the floodway and the remaining 2 on dry land.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business Developments & ProjectsProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Deepsea Nordkapp rig; Source: Odfjell Drilling
Business & Finance

Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year

17 days ago

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

17 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

17 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Deepsea Nordkapp rig; Source: Odfjell Drilling
Business & Finance

Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year

17 days ago
FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

17 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

17 days ago