Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business Developments & Projects›Luxcara picks Geoquip Marine for geotechnical investigation work offshore Germany
Business Developments & Projects

April 22, 2025 · about 1 year ago

Luxcara picks Geoquip Marine for geotechnical investigation work offshore Germany

Luxcara has awarded a contract to Geoquip Marine to perform the main geotechnical investigation for its Waterekke offshore wind farm in the German North Sea. Geoquip Marine’s scope of work includes a detailed geotechnical campaign to characterize subsurface conditions, providing data to support the

1 minutes read
  • LinkedIn
  • X
  • Email
Dorian LPG takes over newbuild dual-fuel LPG and ammonia gas carrier

Luxcara has awarded a contract to Geoquip Marine to perform the main geotechnical investigation for its Waterekke offshore wind farm in the German North Sea.

Geoquip Marine’s scope of work includes a detailed geotechnical campaign to characterize subsurface conditions, providing data to support the planning, design, and timely delivery of the Waterekke offshore wind farm.

Fieldwork is scheduled for completion in 2025. The appointment follows the 2024 collaboration of the two companies on the Waterkant offshore wind farm.

Luxcara won the right to build the 1.5 GW project in the 2024 offshore wind auction. The N-9.3 site is located approximately 85 kilometers northwest of the German island of Helgoland.

The offshore wind farm is expected to be connected to the national transmission grid as early as 2029, according to the developer.

In addition to Waterekke, Luxcara is also developing the Waterkant project in the German North Sea. The wind farm will be built approximately 90 kilometers off the island of Borkum and will have a capacity of about 270 MW.

The project is expected to generate clean electricity for approximately 400,000 households and contribute to Germany’s goal to reach a renewable energy share of 80% in the country’s power mix by 2030.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business Developments & ProjectsOperations & MaintenanceResearch & Development

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

10 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

10 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

10 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

10 days ago