Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business Developments & Projects›Australian wave energy prototype wraps up demonstration campaign
Business Developments & Projects

May 5, 2025 · about 1 year ago

Australian wave energy prototype wraps up demonstration campaign

‘Kwilyilah’, the University of Western Australia’s (UWA) Moored MultiModal Multibody (M4) wave energy converter (WEC), has completed its deployment campaign in King George Sound, Albany.

2 minutes read
  • LinkedIn
  • X
  • Email
Australian wave energy prototype wraps up demonstration campaign

‘ Kwilyilah’, the University of Western Australia’s (UWA) Moored MultiModal Multibody (M4) wave energy converter (WEC), has completed its deployment campaign in King George Sound, Albany.

UWA Oceans Institute lifted the wave energy prototype out of the Albany Marina on May 1, 2025, after the six-month campaign.

To remind, the deployment campaign started on November 8, 2024, putting into operation the 22-meter, 42-tonne M4 device designed to capture wave-generated energy while providing data on its efficiency and potential as a sustainable energy source.

Following more than 130 days of operation and 300h of power generation, UWA Oceans Institute collected more than 3 TB of data that will be analyzed over the next few months.

M4 wave energy converter lifted out of water in King George Sound

The project, run by UWA’s Marine Energy Research Australia and funded by the Blue Economy CRC and the Western Australian State Government, is part of ongoing research into the Great Southern’s potential as a wave energy hub.

The M4 wave energy device , featuring a triangular forward frame, a trailing arm, and a power generator on the connecting hinge, is built from structural steel beams and four steel floater buoys for buoyancy and ballast.

The device has been give name ‘ Kwilyilah ‘, meaning “dolphin,” in collaboration with the Albany Heritage Reference Group to recognize Noongar cultural heritage and reflect its leaping motion above water and the symbolic connection between dolphins and coastal communities.

Related Article

Australian wave energy device begins data transmission in King George Sound (Video)

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business Developments & ProjectsOperations & MaintenanceResearch & Development

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

10 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

10 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

10 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

10 days ago