Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Germany’s next LNG terminal chapter nearly all-set to go live
Business & Finance

May 14, 2025 · about 1 year ago

Germany’s next LNG terminal chapter nearly all-set to go live

Deutsche Energy Terminal (DET), part of the German Federal Ministry for Economic Affairs and Climate Action and a state-owned operator of four liquefied natural gas (LNG) terminals, is closing in on the start-up of Germany’s second terminal in Wilhelmshaven.

2 minutes read
  • LinkedIn
  • X
  • Email
FSRU Excelsior; Source: DET

Deutsche Energy Terminal (DET), part of the German Federal Ministry for Economic Affairs and Climate Action and a state-owned operator of four liquefied natural gas (LNG) terminals, is closing in on the start-up of Germany’s second LNG terminal in Wilhelmshaven.

The final testing of ECOnnect Energy ’s IQuay F-Class system at the Wilhelmshaven II terminal, said to be one of Europe’s most strategically important energy hubs, was expected to entail full system validation under the supervision of key industry partners and regulatory authorities. This system is built to deliver up to 8.5% of Germany’s natural gas imports directly to shore, without the need for fixed marine jetties or invasive construction.

“What’s being tested here is more than just a technical solution. It’s a new model for energy infrastructure that delivers faster, safer, and more sustainable results. Installed offshore in the sensitive Jade Bay ecosystem, the IQuay F-Class demonstrates that innovation and environmental responsibility can go hand in hand,” underlined ECOnnect Energy.

According to the firm’s French contractor, Geocean, the 277-meter-long FSRU Excelsior , owned by the U.S.-based Excelerate Energy , has been moored off the coast of Wilhelmshaven, marking the start of commissioning activities. With a regasification capacity of up to 4.6 billion cubic meters (cbm) of LNG per year, this is described as a key asset in strengthening Europe’s energy resilience.

Geocean, which supported the installation of the IQuay ready-to-use solution for importing LNG to Wilhelmshaven, sees the initiation of the Wilhelmshaven FSRU project as a crucial step towards bolstering Germany’s energy security. With a storage capacity of 138,000 cubic meters of LNG, the FSRU Excelsior is set to feed up to 1.9 billion cubic meters of natural gas into the German gas grid.

Related Article

Germany’s third LNG terminal drawing closer to startup

In collaboration with ECOnnect Energy, the firm installed the subsea connection between the FSRU and the onshore grid through a bespoke offshore installation, entailing the laying of pipelines, installation of two pipeline end manifolds (PLEMs), and thermoplastic composite pipes (TCPs) under what are deemed to have been demanding winter conditions.

“Our modular Fast-Flex barge, specifically configured for this project, enabled fast and secure deployment in shallow waters. The transfer system is now fully operational. Regasified LNG will soon be injected into the German grid via the new WAL II pipeline,” highlighted Geocean.

The list of the DET-operated four LNG terminals on the German North Sea coast includes Wilhelmshaven 1 , Brunsbüttel , Wilhelmshaven II, and Stade . Worley was recently hired to handle the construction, installation, and commissioning services for Phase 2 of the Brunsbüttel FSRU in Germany.

Related Article

Germany on energy security mission: Worley to breathe life into LNG terminal’s next chapter

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceBusiness Developments & ProjectsVessels

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

12 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

12 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

12 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

12 days ago