Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo
Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Fossil Energy›HD Hyundai’s upgrades help CoolCo future-proof its LNG fleet
Fossil Energy

June 2, 2025 · about 1 year ago

HD Hyundai’s upgrades help CoolCo future-proof its LNG fleet

HD Hyundai Marine Solution (HD HMS) has completed the retrofit of a liquefied natural gas (LNG) carrier owned by Bermuda-based LNG carrier owner and operator Cool Company (CoolCo).

2 minutes read
  • LinkedIn
  • X
  • Email
LNG carrier Kool Glacier at sea
LNG carrier Kool Glacier; Source: Lloyd’s Register

South Korea’s HD Hyundai Marine Solution (HD HMS) has completed the retrofit of a liquefied natural gas (LNG) carrier owned by Bermuda-based LNG carrier owner and operator Cool Company (CoolCo).

The re-liquefaction retrofit was performed on the LNG carrier Kool Glacier by HD Hyundai Marine Solution as the turnkey provider at Yiu Lian Dockyard (Shekou) in China.

Lloyd’s Register (LR), which disclosed the news, provided comprehensive technical oversight and flexible classification support in the process. This included the expedited notation for the re-liquefaction unit installation, ensuring the ship’s delivery remained on schedule.

Jose Navarro , Global Gas Technology Director at LR, said: “This achievement demonstrates LR’s reputation as a trusted partner for LNG operators looking to future-proof their fleets. By enabling CoolCo to meet its efficiency and sustainability ambitions, LR continues to lead the way in supporting the transition to a lower-carbon maritime industry.”

The upgrade was designed to manage the boil-off gas (BOG), an issue LR says has affected LNG carriers for a long time. Thanks to the integration of the ALaT TBF 1800 sub-cooling re-liquefaction system, with a capacity of 2.1 tonnes per hour, the 2014-built 162,000-cubic-meter Kool Glacier can now condense this BOG and liquefy it, improving operational efficiency and environmental performance.

The sub-cooler technology is said to cut BOG generated during maritime transportation and waiting periods at terminals, thus reducing operational costs and the vessel’s carbon footprint.

“LR’s flexible approach and technical expertise proved invaluable throughout this complex retrofit project. Their ability to deliver timely solutions, particularly regarding notation assignment exemptions for the re-liquefaction unit, ensured we met our scheduling requirements,” noted CoolCo’s CEO, Richard Tyrrell .

As disclosed, the retrofit commissioning and cold test were completed ahead of schedule, with the vessel departing on March 16, 2025. After that, the Kool Glacier completed gas trials during a laden voyage from Papua New Guinea to Thailand in early May 2025.

This is said to be the second re-liquefaction retrofit in CoolCo’s fleet, following a similar upgrade performed on the Kool Husky . Additionally, two more vessels are scheduled for upgrade, with the company planning to upgrade five vessels in total with sub-coolers. As regulatory pressure increases and fuel efficiency becomes more vital, LR expects these retrofits to become more in demand.

In addition to helping boost LNG fleet efficiency, Lloyd’s Register recently handed out an approval in principle (AiP) for a standardized model of a multi-purpose LNG floater-offshore (MLF-O) to Samsung Heavy Industries, together with two other classification societies.

Related Articles

Fossil Energy

Samsung Heavy’s deepwater FLNG design wins triple blessing

2 min read

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Fossil EnergyLiquefied Natural GasOil & GasBusiness Developments & ProjectsOperations & MaintenanceTechnologyVessels

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1SED Energy Holdings and Ventura Offshore to unite into one
  2. 2New Boskalis rock installation vessel starts work offshore Poland
  3. 321 companies apply for Norway’s new oil & gas exploration areas
  4. 4Spanish shipyard launches its largest-ever vessel, built for Østensjø Rederi

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free