Marine surveys are set to take place in Sandford Bay near Boddam, Peterhead, over the coming months as part of the Eastern Green Link 2 (EGL2) development, which is said to be the UK’s largest electricity transmission project to date.
EGL2 is a joint venture between SSEN Transmission and National Grid Electricity Transmission. The project involves the installation of a 505-kilometer, 2 GW high-voltage direct current (HVDC) subsea cable connecting Peterhead in Scotland to Drax in Yorkshire.
