Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business Developments & Projects›Geotechnical survey coming up at Dogger Bank D offshore wind site
Business Developments & Projects

June 25, 2025 · about 1 year ago

Geotechnical survey coming up at Dogger Bank D offshore wind site

A short geotechnical survey is scheduled to begin at the Dogger Bank D offshore wind farm site in the UK this month. The offshore supply vessel (OSV) Connector will be deployed to carry out the work within the array area and the export cable route. The works will be performed in a single campaign, e

2 minutes read
  • LinkedIn
  • X
  • Email
Dorian LPG takes over newbuild dual-fuel LPG and ammonia gas carrier

Share this article

A short geotechnical survey is scheduled to begin at the Dogger Bank D offshore wind farm site in the UK this month.

The offshore supply vessel (OSV) Connector will be deployed to carry out the work within the array area and the export cable route.

The works will be performed in a single campaign, expected to commence on June 28 and continue until July 12, when all locations will have been surveyed, according to a recently published Notice to Mariners.

Dogger Bank D will have an installed capacity of up to 1.5 GW, according to the latest information shared by the Dogger Bank D joint venture partners, SSE Renewables and Equinor.

Offshore, the wind farm array covers a site of 262 square kilometers and could house up to 113 fixed-bottom offshore wind turbines. The offshore application also proposes up to two offshore platforms, as well as associated export and inter-array subsea cabling that would export power from Dogger Bank D to the national grid at a landfall point near Skipsea, in East Riding of Yorkshire.

From the Skipsea landfall, underground cables would transmit renewable power along a 55-kilometer route to a new onshore substation being developed by National Grid Electricity Transmission near Cottingham, north of Hull, called Birkhill Wood.

SSE Renewables and Equinor are working towards applying for development consent for Dogger Bank D. According to information on the UK Planning Inspectorate’s website, the application for a Development Consent Order (DCO) for the project is expected to be filed between July and September 2026.

This content is available after accepting the cookies.

The first three phases of the Dogger Bank Wind Farm are currently under construction. With an installed capacity of 1.2 GW each, Dogger Bank A, B and C will make up the world’s biggest offshore wind farm with a capacity of 3.6 GW, which would increase to 5.1 GW with Dogger Bank D.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business Developments & Projects

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

20 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

20 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

20 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

20 days ago