Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo
Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Cabling›Nexans’ new cable layer traveling from Poland to Norway to finalize construction
Cabling

June 30, 2025 · about 1 year ago

Nexans’ new cable layer traveling from Poland to Norway to finalize construction

The partially outfitted hull of a new cable-laying vessel (CLV) being built for Nexans has started its journey from Poland to Norway, where it will be finalized. Based on an ST-297 CLV design by Skipsteknisk, Nexans Electra, ordered as the second vessel by Nexans at Norway’s Ulstein Verft, is an upd

1 minutes read
  • LinkedIn
  • X
  • Email
Nexans' new cable layer traveling from Poland to Norway to complete construction
Source: CRIST S.A. via LinkedIn

The partially outfitted hull of a new cable-laying vessel (CLV) being built for Nexans has started its journey from Poland to Norway, where it will be finalized.

Based on an ST-297 CLV design by Skipsteknisk, Nexans Electra, ordered as the second vessel by Nexans at Norway’s Ulstein Verft, is an updated version of the sister vessel Nexans Aurora , delivered in 2021.

The Polish CRIST shipyard reported today, June 30, that the partially outfitted hull of the CLV had left the shipyard in Gdynia and is on its way to Norway.

The grand block ceremony for the vessel was celebrated on September 10, 2024, at CRIST, with the remaining processes such as engineering, outfitting, system integration, equipment preparations, testing, sea trials, and finalization to take place at Ulstein Verft .

The cable layer, 155.2 meters long and 31 meters wide, is designed for laying and servicing power and fiber-optic cables. Equipped with three turntables boasting a 13,500-ton loading capacity, it will be capable of bundle laying of up to four cables simultaneously, hosting a range of subsea tooling including jetting and burial tools.

Palfinger is delivering a comprehensive equipment package , Remacut, part of NOV, the cable-lay equipment , Red Rock an upgraded crane package , and Hydroniq Coolers several of its Pleat seawater coolers .

Delivery is expected next year.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

CablingGridOffshore WindSubseaVesselsVessels & VehiclesBusiness & FinanceBusiness Developments & ProjectsOutlook & StrategyProject & TendersVision

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Norwegian PSV to continue current charter for additional 100 days
  2. 2Italy’s NextGeo to open office in Germany
  3. 3TotalEnergies finds more oil off Angola, enters two exploration blocks
  4. 4Odfjell Drilling’s new rig busy until 2031 thanks to deal with Vår Energi

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free